BMW iX2 xDrive30

BMW iX2 xDrive30 Charging Speed, Time and Cost

Small SUV · 2024 – CurrentFBT exempt

Usable Battery
64.8kWh
AC Charging
22kW
DC Charging
130kW
10–80% Time
29min

The BMW iX2 xDrive30 charges at up to 130 kW on a DC fast charger and 22 kW on AC. It takes about 29 minutes to charge from 10 to 80% and 9.8 hours to charge from empty on a 7 kW home charger. It has a 64.8 kWh NMC battery.

BMW iX2 xDrive30 Key Battery and Charging Specs

BMW iX2 xDrive30 battery and charging specs
Usable Battery64.8 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationRight Side (Rear)
0 to 100% at Home (7 kW)9.8 hrs
Efficiency144 Wh/km

The BMW iX2 xDrive30 uses a 64.8 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for BMW's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

BMW iX2 xDrive30 Charging Times

BMW iX2 xDrive30 Max Charging Speed

BMW iX2 xDrive30 maximum charging speed
TypeMax Speed
AC charging speed22 kW
DC charging speed (peak)130 kW

How Long Does a BMW iX2 xDrive30 Take to Charge?

Power point, wall charger and DC fast charger for the BMW iX2 xDrive30
BMW iX2 xDrive30 charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW29.8 hrs (0 to 100%)16 km per hour
15A power point (3.6 kW)3.6 kW19.0 hrs (0 to 100%)25 km per hour
7 kW home wall charger7 kW9.8 hrs (0 to 100%)49 km per hour
11 kW three-phase charger11 kW6.2 hrs (0 to 100%)76 km per hour
22 kW public AC charger22 kW3.1 hrs (0 to 100%)153 km per hour
50 kW DC fast charger47.5 kW57 min (10 to 80%)82 km in 15 min
150 kW DC fast charger93.8 kW29 min (10 to 80%)163 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the BMW iX2 xDrive30

A 7 kW single-phase wall charger suits the BMW iX2 xDrive30. It charges the battery from empty to full in 9.8 hrs and adds about 49 km of range every hour. If your home already has three-phase power, a 22 kW charger uses the BMW iX2 xDrive30's full AC speed and charges it in 3.1 hrs.

Find the Right Charger for Your BMW iX2 xDrive30

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the BMW iX2 xDrive30
Detail7 kW Single Phase22 kW Three Phase
0 to 100%9.8 hrs3.1 hrs
Range per hour49 km153 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the BMW iX2 xDrive30 Come With a Charger?

New EVs like the BMW iX2 xDrive30 normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 29.8 hrs to fully charge the battery. A 7 kW wall charger does it in 9.8 hrs.

How Much Does It Cost to Charge a BMW iX2 xDrive30?

A full charge costs $4.54 at home on an EV plan at $0.07/kWh, and $22.68 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $45.36. A petrol small SUV uses about 7.5 L/100 km, which at $2.00 a litre costs $15.00 per 100 km.

Cost to charge the BMW iX2 xDrive30 compared with a petrol small SUV
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol small SUVNot applicable$15.00$2,250Not applicable
Home, flat rate $0.35/kWh$22.68$5.04$756$1,494
Home, EV plan $0.07/kWh$4.54$1.01$151$2,099
Public DC $0.70/kWh$45.36$10.08$1,512$738

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $605 a year on charging the BMW iX2 xDrive30 at home.

BMW iX2 xDrive30 Fast Charging Rank and Road Trip Charging

The BMW iX2 xDrive30 ranks 7 of 11 small SUV EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for small SUV EVs priced near the BMW iX2 xDrive30
RankVehiclePricePeak DC (kW)10–80% time
1Volvo EX40 Ultra Twin Motor Performance$81,99020028 min
2Volvo C40 Recharge Plus$78,99015034 min
2Volvo XC40 Recharge Twin$79,49015028 min
2Volvo C40 Recharge Twin$83,49015028 min
2Volvo XC40 Recharge Twin Ultimate$85,99015028 min
7BMW iX2 xDrive30$87,60013029 min

BMW iX2 xDrive30 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 359 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 29 minutes, for a total trip time of about 5 hr 29 min. A 1,000 km trip needs 3 fast charging stops of about 29 minutes each, 1 hr 27 min in total, for a total trip time of about 11 hr 27 min.

Estimated road trip charging for the BMW iX2 xDrive30
TripCharging stopsCharging timeTotal trip time
500 km129 min5 hr 29 min
1,000 km31 hr 27 min11 hr 27 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 130 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

BMW iX2 xDrive30 Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
BMW iX2 xDrive30 bidirectional charging support
FeatureSupportedMax Output
V2LNo
V2HNo
V2GNo

The BMW iX2 xDrive30 does not support bidirectional charging.

BMW iX2 xDrive30 Deals and Finance

Pricing starts from $87,600. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

BMW iX2 xDrive30 Charging FAQ

Track the BMW iX2

Get iX2 price drops, offers and news by email.