
Small Car · 2023 – 2026FBT exemptV2L
The MG MG4 77 kWh RWD charges at up to 135 kW on a DC fast charger and 11 kW on AC. It takes about 23 minutes to charge from 10 to 80% and 11.2 hours to charge from empty on a 7 kW home charger. It has a 74.2 kWh battery.
| Usable Battery | 74.2 kWh |
|---|---|
| Charge Port | Type 2 (AC), CCS2 (DC) |
| Charge Port Location | Left Side (Rear) |
| 0 to 100% at Home (7 kW) | 11.2 hrs |
| Efficiency | 140 Wh/km |
Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.
| Type | Max Speed |
|---|---|
| AC charging speed | 11 kW |
| DC charging speed (peak) | 135 kW |

| Charger | Power Used | Time | Range Added |
|---|---|---|---|
| 10A power point (2.3 kW) | 2.3 kW | 34.1 hrs (0 to 100%) | 16 km per hour |
| 15A power point (3.6 kW) | 3.6 kW | 21.8 hrs (0 to 100%) | 26 km per hour |
| 7 kW home wall charger | 7 kW | 11.2 hrs (0 to 100%) | 50 km per hour |
| 11 kW three-phase charger | 11 kW | 7.1 hrs (0 to 100%) | 79 km per hour |
| 50 kW DC fast charger | 47.5 kW | 66 min (10 to 80%) | 85 km in 15 min |
| 150 kW DC fast charger | 135 kW | 23 min (10 to 80%) | 241 km in 15 min |
Icons: grey = power point, green outline = home charger, dark = public DC fast charger.
A 7 kW single-phase wall charger suits the MG MG4 77 kWh RWD. It charges the battery from empty to full in 11.2 hrs and adds about 50 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the MG MG4 77 kWh RWD's full AC speed and charges it in 7.1 hrs.
See the real charging speed each home charger gets with this car. 3 quick questions.
| Detail | 7 kW Single Phase | 11 kW Three Phase |
|---|---|---|
| 0 to 100% | 11.2 hrs | 7.1 hrs |
| Range per hour | 50 km | 79 km |
| Needs three-phase power | No | Yes |
| Typical installed cost | $1,200 to $2,800 | $1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting |
Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.
New EVs like the MG MG4 77 kWh RWD normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 34.1 hrs to fully charge the battery. A 7 kW wall charger does it in 11.2 hrs.
A full charge costs $5.19 at home on an EV plan at $0.07/kWh, and $25.97 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $51.94. A petrol small car uses about 6.4 L/100 km, which at $2.00 a litre costs $12.80 per 100 km.
| Where You Charge | Full Charge | Per 100 km | Per Year | Saving vs Petrol |
|---|---|---|---|---|
| Petrol small car | Not applicable | $12.80 | $1,920 | Not applicable |
| Home, flat rate $0.35/kWh | $25.97 | $4.90 | $735 | $1,185 |
| Home, EV plan $0.07/kWh | $5.19 | $0.98 | $147 | $1,773 |
| Public DC $0.70/kWh | $51.94 | $9.80 | $1,470 | $450 |
Icons: grey = petrol, green outline = home charging, dark = public charging.
Per year is based on 15,000 km a year.
Switching from a flat tariff to an EV plan saves about $588 a year on charging the MG MG4 77 kWh RWD at home.
The MG MG4 77 kWh RWD ranks 4 of 6 small car EVs priced within $10,000 of it for DC fast charging power.
| Rank | Vehicle | Price | Peak DC (kW) | 10–80% time |
|---|---|---|---|---|
| 1 | Leapmotor B05 Design LR | $39,888 | 174 | 22 min |
| 2 | MG MG4 Essence 64 | $39,990 | 154 | 25 min |
| 3 | MG MG4 XPOWER | $47,990 | 140 | 30 min |
| 4 | MG MG4 77 kWh RWD | $46,990 | 135 | |
| 5 | BYD Dolphin Premium | $36,990 | 89 |
Using Zecar's estimated highway range of 451 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 23 minutes, for a total trip time of about 5 hr 23 min. A 1,000 km trip needs 2 fast charging stops of about 23 minutes each, 46 min in total, for a total trip time of about 10 hr 46 min.
| Trip | Charging stops | Charging time | Total trip time |
|---|---|---|---|
| 500 km | 1 | 23 min | 5 hr 23 min |
| 1,000 km | 2 | 46 min | 10 hr 46 min |
Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 135 kW-capable charger. Real times vary with weather, speed, load and charger.
Plan your trip costs with the EV charging calculator →| Feature | Supported | Max Output |
|---|---|---|
| V2L | Yes | 2.2 kW |
| V2H | No | |
| V2G | No |
The MG MG4 77 kWh RWD supports V2L and can power appliances up to 2.2 kW. It does not support V2H or V2G.
11.2 hrs for 0 to 100% on a 7 kW home charger, and 23 minutes for 10 to 80% at a DC charger of 135 kW or more.
11 kW on AC and 135 kW on DC, adding about 241 km of range in 15 minutes on a fast charger.
Type 2 for AC and CCS2 for DC, on the left side (rear).
$5.19 at home on an EV plan, $25.97 on a flat tariff, or $51.94 at a public DC charger (compare EV energy plans).
Yes, at Superchargers open to non-Tesla EVs, using its CCS2 plug, so check the Tesla app for which sites are open.
Yes, up to 2.2 kW, but it doesn't support V2H or V2G.
Track the MG MG4
Get MG4 price drops, offers and news by email.