
Light Car · 2024 – CurrentFBT exempt
The Mini Cooper SE charges at up to 95 kW on a DC fast charger and 11 kW on AC. It takes about 30 minutes to charge from 10 to 80% and 7.4 hours to charge from empty on a 7 kW home charger. It has a 49 kWh NMC battery.
| Usable Battery | 49 kWh |
|---|---|
| Battery Chemistry | NMC |
| Charge Port | Type 2 (AC), CCS2 (DC) |
| Charge Port Location | Right Side (Rear) |
| 0 to 100% at Home (7 kW) | 7.4 hrs |
| Efficiency | 122 Wh/km |
The Mini Cooper SE uses a 49 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Mini's advice.
Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.
| Type | Max Speed |
|---|---|
| AC charging speed | 11 kW |
| DC charging speed (peak) | 95 kW |

| Charger | Power Used | Time | Range Added |
|---|---|---|---|
| 10A power point (2.3 kW) | 2.3 kW | 22.5 hrs (0 to 100%) | 19 km per hour |
| 15A power point (3.6 kW) | 3.6 kW | 14.4 hrs (0 to 100%) | 30 km per hour |
| 7 kW home wall charger | 7 kW | 7.4 hrs (0 to 100%) | 57 km per hour |
| 11 kW three-phase charger | 11 kW | 4.7 hrs (0 to 100%) | 90 km per hour |
| 50 kW DC fast charger | 47.5 kW | 43 min (10 to 80%) | 97 km in 15 min |
| 150 kW DC fast charger | 68.6 kW | 30 min (10 to 80%) | 141 km in 15 min |
Icons: grey = power point, green outline = home charger, dark = public DC fast charger.
A 7 kW single-phase wall charger suits the Mini Cooper SE. It charges the battery from empty to full in 7.4 hrs and adds about 57 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Mini Cooper SE's full AC speed and charges it in 4.7 hrs.
See the real charging speed each home charger gets with this car. 3 quick questions.
| Detail | 7 kW Single Phase | 11 kW Three Phase |
|---|---|---|
| 0 to 100% | 7.4 hrs | 4.7 hrs |
| Range per hour | 57 km | 90 km |
| Needs three-phase power | No | Yes |
| Typical installed cost | $1,200 to $2,800 | $1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting |
Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.
New EVs like the Mini Cooper SE normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 22.5 hrs to fully charge the battery. A 7 kW wall charger does it in 7.4 hrs.
A full charge costs $3.43 at home on an EV plan at $0.07/kWh, and $17.15 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $34.30.
| Where You Charge | Full Charge | Per 100 km | Per Year |
|---|---|---|---|
| Home, flat rate $0.35/kWh | $17.15 | $4.27 | $641 |
| Home, EV plan $0.07/kWh | $3.43 | $0.85 | $128 |
| Public DC $0.70/kWh | $34.30 | $8.54 | $1,281 |
Icons: grey = petrol, green outline = home charging, dark = public charging.
Per year is based on 15,000 km a year.
Switching from a flat tariff to an EV plan saves about $513 a year on charging the Mini Cooper SE at home.
The Mini Cooper SE ranks 3 of 6 light car EVs priced within $10,000 of it for DC fast charging power.
| Rank | Vehicle | Price | Peak DC (kW) | 10–80% time |
|---|---|---|---|---|
| 1 | Hyundai INSTER Cross | $45,000 | 120 | 30 min |
| 2 | Peugeot e-208 51 kWh | $63,000 | 99 | 27 min |
| 3 | Mini Cooper SE | $53,990 | 95 | 30 min |
| 4 | Fiat 500e La Prima | $52,500 | 85 | 31 min |
| 4 | Abarth 500e | $58,900 | 85 | 31 min |
Using Zecar's estimated highway range of 342 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 30 minutes, for a total trip time of about 5 hr 30 min. A 1,000 km trip needs 3 fast charging stops of about 30 minutes each, 1 hr 30 min in total, for a total trip time of about 11 hr 30 min.
| Trip | Charging stops | Charging time | Total trip time |
|---|---|---|---|
| 500 km | 1 | 30 min | 5 hr 30 min |
| 1,000 km | 3 | 1 hr 30 min | 11 hr 30 min |
Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 95 kW-capable charger. Real times vary with weather, speed, load and charger.
Plan your trip costs with the EV charging calculator →| Feature | Supported | Max Output |
|---|---|---|
| V2L | No | |
| V2H | No | |
| V2G | No |
The Mini Cooper SE does not support bidirectional charging.
Pricing starts from $53,990. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works
Get a Novated Lease Quote7.4 hrs for 0 to 100% on a 7 kW home charger, and 30 minutes for 10 to 80% at a DC charger of 95 kW or more.
11 kW on AC and 95 kW on DC, adding about 141 km of range in 15 minutes on a fast charger.
Type 2 for AC and CCS2 for DC, on the right side (rear).
$3.43 at home on an EV plan, $17.15 on a flat tariff, or $34.30 at a public DC charger (compare EV energy plans).
Yes, at Superchargers open to non-Tesla EVs, using its CCS2 plug, so check the Tesla app for which sites are open.
No, the Mini Cooper SE does not support V2L.
Track the Mini Cooper
Get Cooper price drops, offers and news by email.