MG MGS5 Excite 62

MG MGS5 Excite 62 Charging Speed, Time and Cost

Small SUV · 2025 – CurrentFBT exemptV2L

Usable Battery
62.1kWh
AC Charging
6.6kW
DC Charging
150kW
10–80% Time
27min

The MG MGS5 Excite 62 charges at up to 150 kW on a DC fast charger and 6.6 kW on AC. It takes about 27 minutes to charge from 10 to 80% and 10.0 hours to charge from empty on a 6.6 kW home charger. It has a 62.1 kWh NMC battery.

MG MGS5 Excite 62 Key Battery and Charging Specs

MG MGS5 Excite 62 battery and charging specs
Usable Battery62.1 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationLeft Side (Rear)
0 to 100% at Home (6.6 kW)10.0 hrs
Efficiency144 Wh/km

The MG MGS5 Excite 62 uses a 62.1 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for MG's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

MG MGS5 Excite 62 Charging Times

MG MGS5 Excite 62 Max Charging Speed

MG MGS5 Excite 62 maximum charging speed
TypeMax Speed
AC charging speed6.6 kW
DC charging speed (peak)150 kW

How Long Does a MG MGS5 Excite 62 Take to Charge?

Power point, wall charger and DC fast charger for the MG MGS5 Excite 62
MG MGS5 Excite 62 charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW28.6 hrs (0 to 100%)16 km per hour
15A power point (3.6 kW)3.6 kW18.3 hrs (0 to 100%)25 km per hour
7 kW home wall charger6.6 kW10.0 hrs (0 to 100%)46 km per hour
50 kW DC fast charger47.5 kW55 min (10 to 80%)82 km in 15 min
150 kW DC fast charger97 kW27 min (10 to 80%)168 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the MG MGS5 Excite 62

A 7 kW single-phase wall charger suits the MG MGS5 Excite 62. It charges the battery from empty to full in 10.0 hrs and adds about 46 km of range every hour. The MG MGS5 Excite 62 charges at up to 6.6 kW on AC, so a 7 kW charger runs it at full speed.

Find the Right Charger for Your MG MGS5 Excite 62

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the MG MGS5 Excite 62
Detail7 kW Single Phase
0 to 100%10.0 hrs
Range per hour46 km
Needs three-phase powerNo
Typical installed cost$1,200 to $2,800

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the MG MGS5 Excite 62 Come With a Charger?

New EVs like the MG MGS5 Excite 62 normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 28.6 hrs to fully charge the battery. A 7 kW wall charger does it in 10.0 hrs.

How Much Does It Cost to Charge a MG MGS5 Excite 62?

A full charge costs $4.35 at home on an EV plan at $0.07/kWh, and $21.74 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $43.47. A petrol small SUV uses about 7.5 L/100 km, which at $2.00 a litre costs $15.00 per 100 km.

Cost to charge the MG MGS5 Excite 62 compared with a petrol small SUV
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol small SUVNot applicable$15.00$2,250Not applicable
Home, flat rate $0.35/kWh$21.74$5.04$756$1,494
Home, EV plan $0.07/kWh$4.35$1.01$151$2,099
Public DC $0.70/kWh$43.47$10.08$1,512$738

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $605 a year on charging the MG MGS5 Excite 62 at home.

MG MGS5 Excite 62 Fast Charging Rank and Road Trip Charging

The MG MGS5 Excite 62 ranks 4 of 18 small SUV EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for small SUV EVs priced near the MG MGS5 Excite 62
RankVehiclePricePeak DC (kW)10–80% time
1BYD Atto 3 Evo Premium$46,99022026 min
2Skoda Elroq 85$54,99017528 min
3Leapmotor B10 Design$41,99016832 min
4MG MGS5 Excite 62$44,99015027 min
4MG MGS5 Essence 62$47,99015027 min

MG MGS5 Excite 62 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 335 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 27 minutes, for a total trip time of about 5 hr 27 min. A 1,000 km trip needs 3 fast charging stops of about 27 minutes each, 1 hr 21 min in total, for a total trip time of about 11 hr 21 min.

Estimated road trip charging for the MG MGS5 Excite 62
TripCharging stopsCharging timeTotal trip time
500 km127 min5 hr 27 min
1,000 km31 hr 21 min11 hr 21 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

MG MGS5 Excite 62 Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
MG MGS5 Excite 62 bidirectional charging support
FeatureSupportedMax Output
V2LYes3.3 kW
V2HNo
V2GNo

The MG MGS5 Excite 62 supports V2L and can power appliances up to 3.3 kW. It does not support V2H or V2G.

MG MGS5 Excite 62 Deals and Finance

Pricing starts from $44,990. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

MG MGS5 Excite 62 Charging FAQ

Track the MG MGS5

Get MGS5 price drops, offers and news by email.