Kia EV4 Long Range

Kia EV4 Long Range Charging Speed, Time and Cost

Medium Car · 2025 – CurrentFBT exemptV2L

Usable Battery
78kWh
AC Charging
11kW
DC Charging
135kW
10–80% Time
33min

The Kia EV4 Long Range charges at up to 135 kW on a DC fast charger and 11 kW on AC. It takes about 33 minutes to charge from 10 to 80% and 11.8 hours to charge from empty on a 7 kW home charger. It has a 78 kWh NMC battery.

Kia EV4 Long Range Key Battery and Charging Specs

Kia EV4 Long Range battery and charging specs
Usable Battery78 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationRight Side (Front)
0 to 100% at Home (7 kW)11.8 hrs
Efficiency123 Wh/km

The Kia EV4 Long Range uses a 78 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Kia's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

Kia EV4 Long Range Charging Times

Kia EV4 Long Range Max Charging Speed

Kia EV4 Long Range maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)135 kW

How Long Does a Kia EV4 Long Range Take to Charge?

Power point, wall charger and DC fast charger for the Kia EV4 Long Range
Kia EV4 Long Range charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW35.9 hrs (0 to 100%)19 km per hour
15A power point (3.6 kW)3.6 kW22.9 hrs (0 to 100%)29 km per hour
7 kW home wall charger7 kW11.8 hrs (0 to 100%)57 km per hour
11 kW three-phase charger11 kW7.5 hrs (0 to 100%)89 km per hour
50 kW DC fast charger47.5 kW69 min (10 to 80%)97 km in 15 min
150 kW DC fast charger105 kW33 min (10 to 80%)213 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the Kia EV4 Long Range

A 7 kW single-phase wall charger suits the Kia EV4 Long Range. It charges the battery from empty to full in 11.8 hrs and adds about 57 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Kia EV4 Long Range's full AC speed and charges it in 7.5 hrs.

Find the Right Charger for Your Kia EV4 Long Range

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the Kia EV4 Long Range
Detail7 kW Single Phase11 kW Three Phase
0 to 100%11.8 hrs7.5 hrs
Range per hour57 km89 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the Kia EV4 Long Range Come With a Charger?

New EVs like the Kia EV4 Long Range normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 35.9 hrs to fully charge the battery. A 7 kW wall charger does it in 11.8 hrs.

How Much Does It Cost to Charge a Kia EV4 Long Range?

A full charge costs $5.46 at home on an EV plan at $0.07/kWh, and $27.30 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $54.60. A petrol medium car uses about 7.8 L/100 km, which at $2.00 a litre costs $15.60 per 100 km.

Cost to charge the Kia EV4 Long Range compared with a petrol medium car
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol medium carNot applicable$15.60$2,340Not applicable
Home, flat rate $0.35/kWh$27.30$4.31$646$1,694
Home, EV plan $0.07/kWh$5.46$0.86$129$2,211
Public DC $0.70/kWh$54.60$8.61$1,292$1,048

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $517 a year on charging the Kia EV4 Long Range at home.

Kia EV4 Long Range Fast Charging Rank and Road Trip Charging

The Kia EV4 Long Range ranks 8 of 9 medium car EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for medium car EVs priced near the Kia EV4 Long Range
RankVehiclePricePeak DC (kW)10–80% time
1Mazda 6e GT$49,99019524 min
1Mazda 6e Atenza$52,99019524 min
3Polestar 2 Standard Range Single Motor$62,40018026 min
3Polestar 2 Standard Range Single Motor$62,40018026 min
5Hyundai Ioniq 6 Standard Range RWD$67,30017518 min
8Kia EV4 Long Range$59,19013533 min

Kia EV4 Long Range 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 551 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 33 minutes, for a total trip time of about 5 hr 33 min. A 1,000 km trip needs 2 fast charging stops of about 33 minutes each, 1 hr 6 min in total, for a total trip time of about 11 hr 6 min.

Estimated road trip charging for the Kia EV4 Long Range
TripCharging stopsCharging timeTotal trip time
500 km133 min5 hr 33 min
1,000 km21 hr 6 min11 hr 6 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 135 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

Kia EV4 Long Range Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
Kia EV4 Long Range bidirectional charging support
FeatureSupportedMax Output
V2LYes3.6 kW
V2HNo
V2GNo

The Kia EV4 Long Range supports V2L and can power appliances up to 3.6 kW. It does not support V2H or V2G.

Kia EV4 Long Range Deals and Finance

Pricing starts from $59,190. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

Kia EV4 Long Range Charging FAQ

Track the Kia EV4

Get EV4 price drops, offers and news by email.