IM IM5 Premium

IM IM5 Premium Charging Speed, Time and Cost

Large Car · 2025 – CurrentFBT exempt

Usable Battery
73.5kWh
AC Charging
11kW
DC Charging
153kW
10–80% Time
28min

The IM IM5 Premium charges at up to 153 kW on a DC fast charger and 11 kW on AC. It takes about 28 minutes to charge from 10 to 80% and 11.1 hours to charge from empty on a 7 kW home charger. It has a 73.5 kWh NMC battery.

IM IM5 Premium Key Battery and Charging Specs

IM IM5 Premium battery and charging specs
Usable Battery73.5 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationLeft Side (Rear)
0 to 100% at Home (7 kW)11.1 hrs
Efficiency150 Wh/km

The IM IM5 Premium uses a 73.5 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for IM's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

IM IM5 Premium Charging Times

IM IM5 Premium Max Charging Speed

IM IM5 Premium maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)153 kW

How Long Does a IM IM5 Premium Take to Charge?

Power point, wall charger and DC fast charger for the IM IM5 Premium
IM IM5 Premium charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW33.8 hrs (0 to 100%)15 km per hour
15A power point (3.6 kW)3.6 kW21.6 hrs (0 to 100%)24 km per hour
7 kW home wall charger7 kW11.1 hrs (0 to 100%)47 km per hour
11 kW three-phase charger11 kW7.1 hrs (0 to 100%)73 km per hour
50 kW DC fast charger47.5 kW65 min (10 to 80%)79 km in 15 min
150 kW DC fast charger110 kW28 min (10 to 80%)183 km in 15 min
350 kW DC ultra-fast charger110 kW28 min (10 to 80%)183 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the IM IM5 Premium

A 7 kW single-phase wall charger suits the IM IM5 Premium. It charges the battery from empty to full in 11.1 hrs and adds about 47 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the IM IM5 Premium's full AC speed and charges it in 7.1 hrs.

Find the Right Charger for Your IM IM5 Premium

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the IM IM5 Premium
Detail7 kW Single Phase11 kW Three Phase
0 to 100%11.1 hrs7.1 hrs
Range per hour47 km73 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the IM IM5 Premium Come With a Charger?

New EVs like the IM IM5 Premium normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 33.8 hrs to fully charge the battery. A 7 kW wall charger does it in 11.1 hrs.

How Much Does It Cost to Charge a IM IM5 Premium?

A full charge costs $5.15 at home on an EV plan at $0.07/kWh, and $25.73 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $51.45. A petrol large car uses about 9.8 L/100 km, which at $2.00 a litre costs $19.60 per 100 km.

Cost to charge the IM IM5 Premium compared with a petrol large car
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol large carNot applicable$19.60$2,940Not applicable
Home, flat rate $0.35/kWh$25.73$5.25$788$2,152
Home, EV plan $0.07/kWh$5.15$1.05$158$2,782
Public DC $0.70/kWh$51.45$10.50$1,575$1,365

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $630 a year on charging the IM IM5 Premium at home.

IM IM5 Premium Fast Charging Rank and Road Trip Charging

The IM IM5 Premium charges at up to 153 kW on a DC charger.

IM IM5 Premium 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 421 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 28 minutes, for a total trip time of about 5 hr 28 min. A 1,000 km trip needs 3 fast charging stops of about 28 minutes each, 1 hr 24 min in total, for a total trip time of about 11 hr 24 min.

Estimated road trip charging for the IM IM5 Premium
TripCharging stopsCharging timeTotal trip time
500 km128 min5 hr 28 min
1,000 km31 hr 24 min11 hr 24 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

IM IM5 Premium Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
IM IM5 Premium bidirectional charging support
FeatureSupportedMax Output
V2LNo
V2HNo
V2GNo

The IM IM5 Premium does not support bidirectional charging.

IM IM5 Premium Deals and Finance

Pricing starts from $60,990. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

IM IM5 Premium Charging FAQ

Track the IM IM5

Get IM5 price drops, offers and news by email.