IM IM5 Performance

IM IM5 Performance Charging Speed, Time and Cost

Large Car · 2025 – CurrentFBT exempt

Usable Battery
96.5kWh
AC Charging
11kW
DC Charging
396kW
10–80% Time
21min

The IM IM5 Performance charges at up to 396 kW on a DC fast charger and 11 kW on AC. It takes about 21 minutes to charge from 10 to 80% and 14.6 hours to charge from empty on a 7 kW home charger. It has a 96.5 kWh NMC battery.

IM IM5 Performance Key Battery and Charging Specs

IM IM5 Performance battery and charging specs
Usable Battery96.5 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationLeft Side (Rear)
0 to 100% at Home (7 kW)14.6 hrs
Efficiency168 Wh/km

The IM IM5 Performance uses a 96.5 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for IM's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

IM IM5 Performance Charging Times

IM IM5 Performance Max Charging Speed

IM IM5 Performance maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)396 kW

How Long Does a IM IM5 Performance Take to Charge?

Power point, wall charger and DC fast charger for the IM IM5 Performance
IM IM5 Performance charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW44.4 hrs (0 to 100%)14 km per hour
15A power point (3.6 kW)3.6 kW28.4 hrs (0 to 100%)21 km per hour
7 kW home wall charger7 kW14.6 hrs (0 to 100%)42 km per hour
11 kW three-phase charger11 kW9.3 hrs (0 to 100%)65 km per hour
50 kW DC fast charger47.5 kW85 min (10 to 80%)71 km in 15 min
150 kW DC fast charger142.5 kW28 min (10 to 80%)212 km in 15 min
350 kW DC ultra-fast charger193 kW21 min (10 to 80%)287 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the IM IM5 Performance

A 7 kW single-phase wall charger suits the IM IM5 Performance. It charges the battery from empty to full in 14.6 hrs and adds about 42 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the IM IM5 Performance's full AC speed and charges it in 9.3 hrs.

Find the Right Charger for Your IM IM5 Performance

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the IM IM5 Performance
Detail7 kW Single Phase11 kW Three Phase
0 to 100%14.6 hrs9.3 hrs
Range per hour42 km65 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the IM IM5 Performance Come With a Charger?

New EVs like the IM IM5 Performance normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 44.4 hrs to fully charge the battery. A 7 kW wall charger does it in 14.6 hrs.

How Much Does It Cost to Charge a IM IM5 Performance?

A full charge costs $6.76 at home on an EV plan at $0.07/kWh, and $33.78 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $67.55. A petrol large car uses about 9.8 L/100 km, which at $2.00 a litre costs $19.60 per 100 km.

Cost to charge the IM IM5 Performance compared with a petrol large car
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol large carNot applicable$19.60$2,940Not applicable
Home, flat rate $0.35/kWh$33.78$5.88$882$2,058
Home, EV plan $0.07/kWh$6.76$1.18$176$2,764
Public DC $0.70/kWh$67.55$11.76$1,764$1,176

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $706 a year on charging the IM IM5 Performance at home.

IM IM5 Performance Fast Charging Rank and Road Trip Charging

The IM IM5 Performance ranks 1 of 4 large car EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for large car EVs priced near the IM IM5 Performance
RankVehiclePricePeak DC (kW)10–80% time
1IM IM5 Performance$80,99039621 min
2Volvo ES90 Single Motor$88,88030022 min
3Lexus ES 350e$77,00015028 min
3Lexus ES 500e$84,00015028 min

IM IM5 Performance 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 494 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 21 minutes, for a total trip time of about 5 hr 21 min. A 1,000 km trip needs 2 fast charging stops of about 21 minutes each, 42 min in total, for a total trip time of about 10 hr 42 min.

Estimated road trip charging for the IM IM5 Performance
TripCharging stopsCharging timeTotal trip time
500 km121 min5 hr 21 min
1,000 km242 min10 hr 42 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

IM IM5 Performance Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
IM IM5 Performance bidirectional charging support
FeatureSupportedMax Output
V2LNo
V2HNo
V2GNo

The IM IM5 Performance does not support bidirectional charging.

IM IM5 Performance Deals and Finance

Pricing starts from $80,990. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

IM IM5 Performance Charging FAQ

Track the IM IM5

Get IM5 price drops, offers and news by email.