Polestar 5 Dual Motor

Polestar 5 Dual Motor Charging Speed, Time and Cost

Large Car · 2025 – Current

Usable Battery
106kWh
AC Charging
11kW
DC Charging
250kW
10–80% Time
22min

The Polestar 5 Dual Motor charges at up to 250 kW on a DC fast charger and 11 kW on AC. It takes about 22 minutes to charge from 10 to 80% and 16.0 hours to charge from empty on a 7 kW home charger. It has a 106 kWh NMC battery.

Polestar 5 Dual Motor Key Battery and Charging Specs

Polestar 5 Dual Motor battery and charging specs
Usable Battery106 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationLeft Side (Front)
0 to 100% at Home (7 kW)16.0 hrs
Efficiency158 Wh/km

The Polestar 5 Dual Motor uses a 106 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Polestar's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

Polestar 5 Dual Motor Charging Times

Polestar 5 Dual Motor Max Charging Speed

Polestar 5 Dual Motor maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)250 kW

How Long Does a Polestar 5 Dual Motor Take to Charge?

Power point, wall charger and DC fast charger for the Polestar 5 Dual Motor
Polestar 5 Dual Motor charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW48.8 hrs (0 to 100%)15 km per hour
15A power point (3.6 kW)3.6 kW31.2 hrs (0 to 100%)23 km per hour
7 kW home wall charger7 kW16.0 hrs (0 to 100%)44 km per hour
11 kW three-phase charger11 kW10.2 hrs (0 to 100%)70 km per hour
50 kW DC fast charger47.5 kW94 min (10 to 80%)75 km in 15 min
150 kW DC fast charger142.5 kW31 min (10 to 80%)225 km in 15 min
350 kW DC ultra-fast charger202.4 kW22 min (10 to 80%)320 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the Polestar 5 Dual Motor

A 7 kW single-phase wall charger suits the Polestar 5 Dual Motor. It charges the battery from empty to full in 16.0 hrs and adds about 44 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Polestar 5 Dual Motor's full AC speed and charges it in 10.2 hrs.

Find the Right Charger for Your Polestar 5 Dual Motor

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the Polestar 5 Dual Motor
Detail7 kW Single Phase11 kW Three Phase
0 to 100%16.0 hrs10.2 hrs
Range per hour44 km70 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the Polestar 5 Dual Motor Come With a Charger?

New EVs like the Polestar 5 Dual Motor normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 48.8 hrs to fully charge the battery. A 7 kW wall charger does it in 16.0 hrs.

How Much Does It Cost to Charge a Polestar 5 Dual Motor?

A full charge costs $7.42 at home on an EV plan at $0.07/kWh, and $37.10 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $74.20. A petrol large car uses about 9.8 L/100 km, which at $2.00 a litre costs $19.60 per 100 km.

Cost to charge the Polestar 5 Dual Motor compared with a petrol large car
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol large carNot applicable$19.60$2,940Not applicable
Home, flat rate $0.35/kWh$37.10$5.53$830$2,110
Home, EV plan $0.07/kWh$7.42$1.11$166$2,774
Public DC $0.70/kWh$74.20$11.06$1,659$1,281

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $664 a year on charging the Polestar 5 Dual Motor at home.

Polestar 5 Dual Motor Fast Charging Rank and Road Trip Charging

The Polestar 5 Dual Motor charges at up to 250 kW on a DC charger.

Polestar 5 Dual Motor 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 583 km and an average of 100 km/h: No charging stop needed for a 500 km trip, which takes about 5 hr. A 1,000 km trip needs 2 fast charging stops of about 22 minutes each, 44 min in total, for a total trip time of about 10 hr 44 min.

Estimated road trip charging for the Polestar 5 Dual Motor
TripCharging stopsCharging timeTotal trip time
500 km0No charging stop needed.5 hr
1,000 km244 min10 hr 44 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

Polestar 5 Dual Motor Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
Polestar 5 Dual Motor bidirectional charging support
FeatureSupportedMax Output
V2LNo
V2HNo
V2GNo

The Polestar 5 Dual Motor does not support bidirectional charging.

Polestar 5 Dual Motor Deals and Finance

Pricing starts from $157,705. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

Polestar 5 Dual Motor Charging FAQ

Track the Polestar 5

Get 5 price drops, offers and news by email.