MG Cyberster RWD

MG Cyberster RWD Charging Speed, Time and Cost

Medium Car · 2024 – CurrentV2L

Usable Battery
74.4kWh
AC Charging
11kW
DC Charging
144kW
10–80% Time
48min

The MG Cyberster RWD charges at up to 144 kW on a DC fast charger and 11 kW on AC. It takes about 48 minutes to charge from 10 to 80% and 11.2 hours to charge from empty on a 7 kW home charger. It has a 74.4 kWh NMC battery.

MG Cyberster RWD Key Battery and Charging Specs

MG Cyberster RWD battery and charging specs
Usable Battery74.4 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationLeft Side (Rear)
0 to 100% at Home (7 kW)11.2 hrs
Efficiency146 Wh/km

The MG Cyberster RWD uses a 74.4 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for MG's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

MG Cyberster RWD Charging Times

MG Cyberster RWD Max Charging Speed

MG Cyberster RWD maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)144 kW

How Long Does a MG Cyberster RWD Take to Charge?

Power point, wall charger and DC fast charger for the MG Cyberster RWD
MG Cyberster RWD charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW34.2 hrs (0 to 100%)16 km per hour
15A power point (3.6 kW)3.6 kW21.9 hrs (0 to 100%)25 km per hour
7 kW home wall charger7 kW11.2 hrs (0 to 100%)48 km per hour
11 kW three-phase charger11 kW7.2 hrs (0 to 100%)75 km per hour
50 kW DC fast charger47.5 kW66 min (10 to 80%)81 km in 15 min
150 kW DC fast charger65.1 kW48 min (10 to 80%)111 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the MG Cyberster RWD

A 7 kW single-phase wall charger suits the MG Cyberster RWD. It charges the battery from empty to full in 11.2 hrs and adds about 48 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the MG Cyberster RWD's full AC speed and charges it in 7.2 hrs.

Find the Right Charger for Your MG Cyberster RWD

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the MG Cyberster RWD
Detail7 kW Single Phase11 kW Three Phase
0 to 100%11.2 hrs7.2 hrs
Range per hour48 km75 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the MG Cyberster RWD Come With a Charger?

New EVs like the MG Cyberster RWD normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 34.2 hrs to fully charge the battery. A 7 kW wall charger does it in 11.2 hrs.

How Much Does It Cost to Charge a MG Cyberster RWD?

A full charge costs $5.21 at home on an EV plan at $0.07/kWh, and $26.04 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $52.08. A petrol medium car uses about 7.8 L/100 km, which at $2.00 a litre costs $15.60 per 100 km.

Cost to charge the MG Cyberster RWD compared with a petrol medium car
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol medium carNot applicable$15.60$2,340Not applicable
Home, flat rate $0.35/kWh$26.04$5.11$767$1,573
Home, EV plan $0.07/kWh$5.21$1.02$153$2,187
Public DC $0.70/kWh$52.08$10.22$1,533$807

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $614 a year on charging the MG Cyberster RWD at home.

MG Cyberster RWD Fast Charging Rank and Road Trip Charging

The MG Cyberster RWD ranks 3 of 3 medium car EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for medium car EVs priced near the MG Cyberster RWD
RankVehiclePricePeak DC (kW)10–80% time
1BMW i3 40 xDrive$96,90040021 min
2BMW i4 eDrive40$99,90020530 min
3MG Cyberster RWD$99,90014448 min

MG Cyberster RWD 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 438 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 48 minutes, for a total trip time of about 5 hr 48 min. A 1,000 km trip needs 2 fast charging stops of about 48 minutes each, 1 hr 36 min in total, for a total trip time of about 11 hr 36 min.

Estimated road trip charging for the MG Cyberster RWD
TripCharging stopsCharging timeTotal trip time
500 km148 min5 hr 48 min
1,000 km21 hr 36 min11 hr 36 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 144 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

MG Cyberster RWD Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
MG Cyberster RWD bidirectional charging support
FeatureSupportedMax Output
V2LYes3.3 kW
V2HNo
V2GNo

The MG Cyberster RWD supports V2L and can power appliances up to 3.3 kW. It does not support V2H or V2G.

MG Cyberster RWD Deals and Finance

Pricing starts from $99,900. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

MG Cyberster RWD Charging FAQ

Track the MG Cyberster

Get Cyberster price drops, offers and news by email.