LDV eDeliver 5 LWB Low Roof

LDV eDeliver 5 LWB Low Roof Charging Speed, Time and Cost

Van · 2026 – CurrentFBT exemptV2L

Usable Battery
64kWh
AC Charging
11kW
DC Charging
70kW
10–80% Time
42min

The LDV eDeliver 5 LWB Low Roof charges at up to 70 kW on a DC fast charger and 11 kW on AC. It takes about 42 minutes to charge from 10 to 80% and 9.7 hours to charge from empty on a 7 kW home charger. It has a 64 kWh LFP battery.

LDV eDeliver 5 LWB Low Roof Key Battery and Charging Specs

LDV eDeliver 5 LWB Low Roof battery and charging specs
Usable Battery64 kWh
Battery ChemistryLFP
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationRight Side (Front)
0 to 100% at Home (7 kW)9.7 hrs
Efficiency199 Wh/km

The LDV eDeliver 5 LWB Low Roof uses a 64 kWh LFP battery. LFP batteries handle regular charging to 100% with less wear than other chemistries (LFP vs NMC vs NCA batteries explained). Check your owner's manual for LDV's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

LDV eDeliver 5 LWB Low Roof Charging Times

LDV eDeliver 5 LWB Low Roof Max Charging Speed

LDV eDeliver 5 LWB Low Roof maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)70 kW

How Long Does a LDV eDeliver 5 LWB Low Roof Take to Charge?

Power point, wall charger and DC fast charger for the LDV eDeliver 5 LWB Low Roof
LDV eDeliver 5 LWB Low Roof charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW29.4 hrs (0 to 100%)12 km per hour
15A power point (3.6 kW)3.6 kW18.8 hrs (0 to 100%)18 km per hour
7 kW home wall charger7 kW9.7 hrs (0 to 100%)35 km per hour
11 kW three-phase charger11 kW6.2 hrs (0 to 100%)55 km per hour
50 kW DC fast charger47.5 kW57 min (10 to 80%)60 km in 15 min
150 kW DC fast charger64 kW42 min (10 to 80%)80 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the LDV eDeliver 5 LWB Low Roof

A 7 kW single-phase wall charger suits the LDV eDeliver 5 LWB Low Roof. It charges the battery from empty to full in 9.7 hrs and adds about 35 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the LDV eDeliver 5 LWB Low Roof's full AC speed and charges it in 6.2 hrs.

Find the Right Charger for Your LDV eDeliver 5 LWB Low Roof

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the LDV eDeliver 5 LWB Low Roof
Detail7 kW Single Phase11 kW Three Phase
0 to 100%9.7 hrs6.2 hrs
Range per hour35 km55 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the LDV eDeliver 5 LWB Low Roof Come With a Charger?

New EVs like the LDV eDeliver 5 LWB Low Roof normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 29.4 hrs to fully charge the battery. A 7 kW wall charger does it in 9.7 hrs.

How Much Does It Cost to Charge a LDV eDeliver 5 LWB Low Roof?

A full charge costs $4.48 at home on an EV plan at $0.07/kWh, and $22.40 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $44.80. A petrol mid-size van uses about 7.6 L/100 km, which at $2.00 a litre costs $15.20 per 100 km.

Cost to charge the LDV eDeliver 5 LWB Low Roof compared with a petrol mid-size van
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol mid-size vanNot applicable$15.20$2,280Not applicable
Home, flat rate $0.35/kWh$22.40$6.97$1,045$1,235
Home, EV plan $0.07/kWh$4.48$1.39$209$2,071
Public DC $0.70/kWh$44.80$13.93$2,090$190

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $836 a year on charging the LDV eDeliver 5 LWB Low Roof at home.

LDV eDeliver 5 LWB Low Roof Fast Charging Rank and Road Trip Charging

The LDV eDeliver 5 LWB Low Roof ranks 7 of 9 van EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for van EVs priced near the LDV eDeliver 5 LWB Low Roof
RankVehiclePricePeak DC (kW)10–80% time
1Kia PV5 Cargo S Long Range$55,99012830 min
2Farizon V7E SR$49,99010021 min
2Farizon V7E LR$53,99010035 min
2Peugeot e-PARTNER Test$59,99010026 min
2Peugeot e-PARTNER$59,99010026 min
7LDV eDeliver 5 LWB Low Roof$55,7797042 min

LDV eDeliver 5 LWB Low Roof 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 234 km and an average of 100 km/h: A 500 km trip needs 2 fast charging stops of about 42 minutes each, 1 hr 24 min in total, for a total trip time of about 6 hr 24 min. A 1,000 km trip needs 5 fast charging stops of about 42 minutes each, 3 hr 30 min in total, for a total trip time of about 13 hr 30 min.

Estimated road trip charging for the LDV eDeliver 5 LWB Low Roof
TripCharging stopsCharging timeTotal trip time
500 km21 hr 24 min6 hr 24 min
1,000 km53 hr 30 min13 hr 30 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 70 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

LDV eDeliver 5 LWB Low Roof Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
LDV eDeliver 5 LWB Low Roof bidirectional charging support
FeatureSupportedMax Output
V2LYes6.6 kW
V2HNo
V2GNo

The LDV eDeliver 5 LWB Low Roof supports V2L and can power appliances up to 6.6 kW. It does not support V2H or V2G.

LDV eDeliver 5 LWB Low Roof Deals and Finance

Pricing starts from $55,779. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

LDV eDeliver 5 LWB Low Roof Charging FAQ

Track the LDV eDeliver 5

Get eDeliver 5 price drops, offers and news by email.