Denza D9 FWD

Denza D9 FWD Charging Speed, Time and Cost

People Mover · 2026 – CurrentFBT exemptV2L

Usable Battery
103.3kWh
AC Charging
11kW
DC Charging
200kW
10–80% Time
50min

The Denza D9 FWD charges at up to 200 kW on a DC fast charger and 11 kW on AC. It takes about 50 minutes to charge from 10 to 80% and 15.6 hours to charge from empty on a 7 kW home charger. It has a 103.3 kWh LFP battery.

Denza D9 FWD Key Battery and Charging Specs

Denza D9 FWD battery and charging specs
Usable Battery103.3 kWh
Battery ChemistryLFP
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationRight Side (Rear)
0 to 100% at Home (7 kW)15.6 hrs
Efficiency199 Wh/km

The Denza D9 FWD uses a 103.3 kWh LFP battery. LFP batteries handle regular charging to 100% with less wear than other chemistries (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Denza's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

Denza D9 FWD Charging Times

Denza D9 FWD Max Charging Speed

Denza D9 FWD maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)200 kW

How Long Does a Denza D9 FWD Take to Charge?

Power point, wall charger and DC fast charger for the Denza D9 FWD
Denza D9 FWD charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW47.5 hrs (0 to 100%)12 km per hour
15A power point (3.6 kW)3.6 kW30.4 hrs (0 to 100%)18 km per hour
7 kW home wall charger7 kW15.6 hrs (0 to 100%)35 km per hour
11 kW three-phase charger11 kW9.9 hrs (0 to 100%)55 km per hour
50 kW DC fast charger47.5 kW91 min (10 to 80%)60 km in 15 min
150 kW DC fast charger87 kW50 min (10 to 80%)109 km in 15 min
350 kW DC ultra-fast charger87 kW50 min (10 to 80%)109 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the Denza D9 FWD

A 7 kW single-phase wall charger suits the Denza D9 FWD. It charges the battery from empty to full in 15.6 hrs and adds about 35 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Denza D9 FWD's full AC speed and charges it in 9.9 hrs.

Find the Right Charger for Your Denza D9 FWD

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the Denza D9 FWD
Detail7 kW Single Phase11 kW Three Phase
0 to 100%15.6 hrs9.9 hrs
Range per hour35 km55 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the Denza D9 FWD Come With a Charger?

New EVs like the Denza D9 FWD normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 47.5 hrs to fully charge the battery. A 7 kW wall charger does it in 15.6 hrs.

How Much Does It Cost to Charge a Denza D9 FWD?

A full charge costs $7.23 at home on an EV plan at $0.07/kWh, and $36.16 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $72.31.

Cost to charge the Denza D9 FWD
Where You ChargeFull ChargePer 100 kmPer Year
Home, flat rate $0.35/kWh$36.16$6.97$1,045
Home, EV plan $0.07/kWh$7.23$1.39$209
Public DC $0.70/kWh$72.31$13.93$2,090

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $836 a year on charging the Denza D9 FWD at home.

Denza D9 FWD Fast Charging Rank and Road Trip Charging

The Denza D9 FWD ranks 2 of 5 people mover EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for people mover EVs priced near the Denza D9 FWD
RankVehiclePricePeak DC (kW)10–80% time
1XPENG X9 FWD Standard Range$89,90053712 min
2Denza D9 FWD$85,99020050 min
2Volkswagen ID.Buzz Pro LWB$91,29020026 min
2Denza D9 AWD$95,99020050 min
5Volkswagen ID.Buzz Pro SWB$87,99018526 min

Denza D9 FWD 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 380 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 50 minutes, for a total trip time of about 5 hr 50 min. A 1,000 km trip needs 3 fast charging stops of about 50 minutes each, 2 hr 30 min in total, for a total trip time of about 12 hr 30 min.

Estimated road trip charging for the Denza D9 FWD
TripCharging stopsCharging timeTotal trip time
500 km150 min5 hr 50 min
1,000 km32 hr 30 min12 hr 30 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

Denza D9 FWD Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
Denza D9 FWD bidirectional charging support
FeatureSupportedMax Output
V2LYes6.6 kW
V2HNo
V2GNo

The Denza D9 FWD supports V2L and can power appliances up to 6.6 kW. It does not support V2H or V2G.

Denza D9 FWD Deals and Finance

Pricing starts from $85,990. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

Denza D9 FWD Charging FAQ

Track the Denza D9

Get D9 price drops, offers and news by email.