Cupra Tavascan VZ

Cupra Tavascan VZ Charging Speed, Time and Cost

Medium SUV · 2025 – CurrentFBT exemptV2L

Usable Battery
77kWh
AC Charging
11kW
DC Charging
135kW
10–80% Time
28min

The Cupra Tavascan VZ charges at up to 135 kW on a DC fast charger and 11 kW on AC. It takes about 28 minutes to charge from 10 to 80% and 11.6 hours to charge from empty on a 7 kW home charger. It has a 77 kWh NMC battery.

Cupra Tavascan VZ Key Battery and Charging Specs

Cupra Tavascan VZ battery and charging specs
Usable Battery77 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationRight Side (Rear)
0 to 100% at Home (7 kW)11.6 hrs
Efficiency148 Wh/km

The Cupra Tavascan VZ uses a 77 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Cupra's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

Cupra Tavascan VZ Charging Times

Cupra Tavascan VZ Max Charging Speed

Cupra Tavascan VZ maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)135 kW

How Long Does a Cupra Tavascan VZ Take to Charge?

Power point, wall charger and DC fast charger for the Cupra Tavascan VZ
Cupra Tavascan VZ charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW35.4 hrs (0 to 100%)16 km per hour
15A power point (3.6 kW)3.6 kW22.6 hrs (0 to 100%)24 km per hour
7 kW home wall charger7 kW11.6 hrs (0 to 100%)47 km per hour
11 kW three-phase charger11 kW7.4 hrs (0 to 100%)74 km per hour
50 kW DC fast charger47.5 kW68 min (10 to 80%)80 km in 15 min
150 kW DC fast charger115.5 kW28 min (10 to 80%)195 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the Cupra Tavascan VZ

A 7 kW single-phase wall charger suits the Cupra Tavascan VZ. It charges the battery from empty to full in 11.6 hrs and adds about 47 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Cupra Tavascan VZ's full AC speed and charges it in 7.4 hrs.

Find the Right Charger for Your Cupra Tavascan VZ

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the Cupra Tavascan VZ
Detail7 kW Single Phase11 kW Three Phase
0 to 100%11.6 hrs7.4 hrs
Range per hour47 km74 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the Cupra Tavascan VZ Come With a Charger?

New EVs like the Cupra Tavascan VZ normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 35.4 hrs to fully charge the battery. A 7 kW wall charger does it in 11.6 hrs.

How Much Does It Cost to Charge a Cupra Tavascan VZ?

A full charge costs $5.39 at home on an EV plan at $0.07/kWh, and $26.95 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $53.90. A petrol medium SUV uses about 10.2 L/100 km, which at $2.00 a litre costs $20.40 per 100 km.

Cost to charge the Cupra Tavascan VZ compared with a petrol medium SUV
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol medium SUVNot applicable$20.40$3,060Not applicable
Home, flat rate $0.35/kWh$26.95$5.18$777$2,283
Home, EV plan $0.07/kWh$5.39$1.04$155$2,905
Public DC $0.70/kWh$53.90$10.36$1,554$1,506

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $622 a year on charging the Cupra Tavascan VZ at home.

Cupra Tavascan VZ Fast Charging Rank and Road Trip Charging

The Cupra Tavascan VZ ranks 20 of 21 medium SUV EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for medium SUV EVs priced near the Cupra Tavascan VZ
RankVehiclePricePeak DC (kW)10–80% time
1Smart #5 BRABUS$73,90040018 min
2IM IM6 Platinum$69,99039621 min
2IM IM6 Performance$80,99039621 min
4Mercedes-Benz GLB 250+ electric$74,99032022 min
5Kia EV6 RWD$72,66026317 min
20Cupra Tavascan VZ$74,99013528 min

Cupra Tavascan VZ 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 418 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 28 minutes, for a total trip time of about 5 hr 28 min. A 1,000 km trip needs 3 fast charging stops of about 28 minutes each, 1 hr 24 min in total, for a total trip time of about 11 hr 24 min.

Estimated road trip charging for the Cupra Tavascan VZ
TripCharging stopsCharging timeTotal trip time
500 km128 min5 hr 28 min
1,000 km31 hr 24 min11 hr 24 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 135 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

Cupra Tavascan VZ Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
Cupra Tavascan VZ bidirectional charging support
FeatureSupportedMax Output
V2LYes3.6 kW
V2HNo
V2GNo

The Cupra Tavascan VZ supports V2L and can power appliances up to 3.6 kW. It does not support V2H or V2G.

Cupra Tavascan VZ Deals and Finance

Pricing starts from $74,990. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

Cupra Tavascan VZ Charging FAQ

Track the Cupra Tavascan

Get Tavascan price drops, offers and news by email.