





Cupra Tavascan VZ Charging Guide: Time, Speed, Power
Price: $74,990
Available since 2025
Variants
Key EV Specs
82kWh
Battery Size (capacity)
522 km
Range (WLTP)
148 Wh/km
Efficiency
5.5 s
Acceleration (0-100 km/hr)
11 kW AC / 135 kW DC
Charge Power (max)
Cupra Tavascan VZ Charging Overview and Charging Specs
The Cupra Tavascan VZ is equipped with a 82 kWh battery and supports both AC and DC charging. With the right setup, you can charge conveniently at home or use public charging stations for faster top-ups. This guide covers charging times, costs, plug types, and tips to maximise efficiency. The Tavascan VZ uses a Type 2 plug for AC charging and a CCS connector for DC fast charging, both standard in Australia.
| Battery size (capacity) | 82 kWh |
| Battery Size (useable) | 77 kWh |
| Battery Chemistry | NMC |
| Charge Port Type | Type 2 |
| Charge Port Location | Right Side - Rear |
| Charge Power (max) | 11 kW |
| Charge Speed | 67 km/h |
| Charge Time (0-100%) | 8 hrs 18 mins |
Cupra Tavascan VZ Charging Times and Speeds
The Cupra Tavascan VZ has a charging limit of 11 kW AC. This means that a three-phase 22kW AC charger will only supply power at 11 kW AC. If you are using a 7.2 kW AC charger, power will be limited to 7.2 kW AC. The table below provides charging times across different charger types.
Use our EV charging calculator if you want to customise your charge level and speed.
Charging Station Comparison
| Charger Type | Power Output (Average) | 0–100% Time | 10–80% Time | Speed |
|---|---|---|---|---|
| Home AC (7kW) | 7 kW | 11.6 hr | - | 47 km/h |
| Public AC (22kW) | 11 kW | 7.4 hr | - | 74 km/h |
| DC Fast (50kW) | 50 kW | - | 68 min | 338 km/h |
| DC Fast (150kW) | 116 kW | - | 29 min | 784 km/h |
| Ultra-Fast DC (350kW) | 116 kW | - | 29 min | 784 km/h |
Cupra Tavascan VZ Charging Costs & Energy Use
The cost of charging a Cupra Tavascan VZ will depend on where it is being charged. The costs of charging from home versus charging as a fast public charging station vary significantly.
The cost of fully charging a Cupra Tavascan VZ on a typical home flat energy tariff of $0.35/kWh is $28.70.
The cost of fully charging the Cupra Tavascan VZ at a fast public station, where rates as high as $0.7/kWh will be $57.40.
Use our EV charging calculator to get a personalised estimate of the charging costs for a Cupra Tavascan VZ
CCS CompatibleCupra Tavascan VZ Fast Charging & Tesla Supercharger Compatibility
The Cupra Tavascan VZ can charge from 10–80% in approximately 28 minutes on a high-power DC charger.
While most Tesla Superchargers in Australia now support non-Tesla EVs such as the Cupra Tavascan VZ via the CCS2 standard, always check the Tesla app for station compatibility.
Charging Specifications:
Usable Battery Capacity:
82 kWh
Fast Charge Power (max):
135 kW
Fast Charge Power (avg):
116 kW
Max Fast Charging Speed:
744 km/h
Charge Port:
Type 2
Port Location:
Right Side (Rear)
Cupra Tavascan VZ Recommended Charge Level
The Cupra Tavascan VZ uses an NMC battery. The typical recommended charge limit is 80% to 90% for daily use and only charge to 100% for longer trips.
The recommended charge limit for NMC batteries is due to higher degradation risk from a higher state of charge.
Check your owners manual for specific recommendations for the Cupra Tavascan VZ.
Cupra Tavascan VZ Bidirectional Charging (V2G/V2H/V2L)
The Cupra Tavascan VZ currently supports bidirectional charging features such as Vehicle-to-Load (V2L).
| Feature | Supported | Max Power Output |
|---|---|---|
| Vehicle-to-Grid (V2G) | No | - |
| Vehicle-to-Home (V2H) | No | - |
| Vehicle-to-Load (V2L) | Yes | 3.6 kW |