





Large SUV · 2025 – CurrentFBT exempt
$73,900RRP before on-road costs
See all E07 variants and prices →
The Deepal E07 AWD Peformance is an all-wheel-drive large SUV priced from $73,900 RRP, with a 93.6kWh NMC battery and 510km of WLTP range (an estimated 479km in mixed real-world driving).
See what this E07 costs per week on a novated leaseFBT exempt
| Battery capacity (total) | 93.6 kWh |
|---|---|
| Battery capacity (usable) | 90 kWh |
| Battery chemistry | NMC |
| Charge port (AC / DC) | Type 2 / CCS2 |
| Charge port location | Left Side - Rear |
| AC charging (max) | 7 kW |
|---|---|
| AC charge time (0–100%) | 13 hrs |
| DC fast charging (max) | 240 kW |
| DC fast charging (avg) | 180 kW |
| DC charge time (10–80%) | 21 minutes |
See the real charging speed each home charger gets with this car. 3 quick questions.
A full charge costs different amounts depending on your electricity plan and time-of-use rates. Enter your own rate in the EV charging cost calculator to see what the Deepal E07 AWD Peformance costs you, or read the full Deepal E07 AWD Peformance charging guide for home, public and fast-charging times.
| Vehicle-to-Load (V2L) | Yes |
|---|---|
| Max power output (V2L) | 6.6 kW |
| Vehicle-to-Home (V2H) | No |
|---|---|
| Vehicle-to-Grid (V2G) | No |
| Test | Range | Consumption |
|---|---|---|
| WLTP (combined) | 510 km | 176 Wh/km |
| Real-world (Combined)* | 479 km | 187 Wh/km |
| Real-world (City)* | 524 km | 171 Wh/km |
| Real-world (Highway)* | 398 km | 226 Wh/km |
*Estimated
| 0–100 km/h | 3.96 s |
|---|---|
| Top speed | 210 km/h |
| Power (max) | 440 kW |
| Torque (max) | 645 Nm |
|---|---|
| Drive | All-wheel drive (AWD) |
| Powertrain | BEV |
| Seats | 5 |
|---|---|
| Length × width × height | 5,045 × 1,996 × 1,680 mm |
| Wheelbase | 3,120 mm |
| Ground clearance | 233 mm |
| Kerb weight | 2,440 kg |
| Body type | SUV |
| Turning circle | 12.3 m |
| Boot space (seats up / folded) | 524 L / 1,654 L |
|---|---|
| Frunk | 131 L |
| Towing (braked / unbraked) | 1,500 kg / 750 kg |
| Dedicated EV platform | Yes |
| Platform | Changan EPA1 |
| Segment | Large SUV |
| Variant | Price | Range (WLTP) | Battery | 0–100 km/h | Drive |
|---|---|---|---|---|---|
| RWD | $64,900 | 550 km | 93.6 kWh | 6.7 s | Rear |
| AWD PeformanceThis page | $73,900 | 510 km | 93.6 kWh | 3.96 s | AWD |
| Vehicle warranty | 7 years / 160,000 km |
|---|---|
| Battery warranty | 8 years / 240,000 km |
| Service interval | 12 months / 20,000 km |
$73,900 RRP before on-road costs.
An estimated 479km in mixed real-world driving, against 510km on the WLTP test.
About 13 hrs from empty on a 7kW home wallbox, or about 21 minutes from 10-80% on a DC fast charger.
About $30 for a full charge at home at 33c/kWh (90kWh battery, estimated). Charging cost calculator
Yes. At $73,900 it is under the $91,387 LCT threshold for fuel-efficient cars, so it qualifies for the FBT exemption on a novated lease. See your weekly cost
The Deepal E07 RWD is priced at $64,900, $9,000 less. It has 550km WLTP range vs 510km, 0-100 in 6.7s vs 3.96s. Compare all E07 variants
Subscribe to get the latest EV news and deals!
Price drops, new variants and offers on the E07 you're looking at.
$73,900
RRP before on-road costs