Zeekr 7GT RWD

Zeekr 7GT RWD Charging Speed, Time and Cost

Medium Car · 2027 – CurrentV2L

Usable Battery
74kWh
AC Charging
11kW
DC Charging
480kW
10–80% Time
13min

The Zeekr 7GT RWD charges at up to 480 kW on a DC fast charger and 11 kW on AC. It takes about 13 minutes to charge from 10 to 80% and 11.2 hours to charge from empty on a 7 kW home charger. It has a 74 kWh LFP battery.

Zeekr 7GT RWD Key Battery and Charging Specs

Zeekr 7GT RWD battery and charging specs
Usable Battery74 kWh
Battery ChemistryLFP
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationLeft Side (Rear)
0 to 100% at Home (7 kW)11.2 hrs
Efficiency143 Wh/km

The Zeekr 7GT RWD uses a 74 kWh LFP battery. LFP batteries handle regular charging to 100% with less wear than other chemistries (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Zeekr's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

Zeekr 7GT RWD Charging Times

Zeekr 7GT RWD Max Charging Speed

Zeekr 7GT RWD maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)480 kW

How Long Does a Zeekr 7GT RWD Take to Charge?

Power point, wall charger and DC fast charger for the Zeekr 7GT RWD
Zeekr 7GT RWD charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW34.0 hrs (0 to 100%)16 km per hour
15A power point (3.6 kW)3.6 kW21.8 hrs (0 to 100%)25 km per hour
7 kW home wall charger7 kW11.2 hrs (0 to 100%)49 km per hour
11 kW three-phase charger11 kW7.1 hrs (0 to 100%)77 km per hour
50 kW DC fast charger47.5 kW65 min (10 to 80%)83 km in 15 min
150 kW DC fast charger142.5 kW22 min (10 to 80%)249 km in 15 min
350 kW DC ultra-fast charger239 kW13 min (10 to 80%)418 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the Zeekr 7GT RWD

A 7 kW single-phase wall charger suits the Zeekr 7GT RWD. It charges the battery from empty to full in 11.2 hrs and adds about 49 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Zeekr 7GT RWD's full AC speed and charges it in 7.1 hrs.

Find the Right Charger for Your Zeekr 7GT RWD

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the Zeekr 7GT RWD
Detail7 kW Single Phase11 kW Three Phase
0 to 100%11.2 hrs7.1 hrs
Range per hour49 km77 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the Zeekr 7GT RWD Come With a Charger?

New EVs like the Zeekr 7GT RWD normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 34.0 hrs to fully charge the battery. A 7 kW wall charger does it in 11.2 hrs.

How Much Does It Cost to Charge a Zeekr 7GT RWD?

A full charge costs $5.18 at home on an EV plan at $0.07/kWh, and $25.90 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $51.80. A petrol medium car uses about 7.8 L/100 km, which at $2.00 a litre costs $15.60 per 100 km.

Cost to charge the Zeekr 7GT RWD compared with a petrol medium car
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol medium carNot applicable$15.60$2,340Not applicable
Home, flat rate $0.35/kWh$25.90$5.01$751$1,589
Home, EV plan $0.07/kWh$5.18$1.00$150$2,190
Public DC $0.70/kWh$51.80$10.01$1,502$838

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $601 a year on charging the Zeekr 7GT RWD at home.

Zeekr 7GT RWD Fast Charging Rank and Road Trip Charging

The Zeekr 7GT RWD charges at up to 480 kW on a DC charger.

Zeekr 7GT RWD 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 436 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 13 minutes, for a total trip time of about 5 hr 13 min. A 1,000 km trip needs 2 fast charging stops of about 13 minutes each, 26 min in total, for a total trip time of about 10 hr 26 min.

Estimated road trip charging for the Zeekr 7GT RWD
TripCharging stopsCharging timeTotal trip time
500 km113 min5 hr 13 min
1,000 km226 min10 hr 26 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

Zeekr 7GT RWD Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
Zeekr 7GT RWD bidirectional charging support
FeatureSupportedMax Output
V2LYes3.3 kW
V2HNo
V2GNo

The Zeekr 7GT RWD supports V2L and can power appliances up to 3.3 kW. It does not support V2H or V2G.

Zeekr 7GT RWD Charging FAQ

Track the Zeekr 7GT

Get 7GT price drops, offers and news by email.