Zeekr 7GT Performance AWD

Zeekr 7GT Performance AWD Charging Speed, Time and Cost

Medium Car · 2027 – CurrentV2L

Usable Battery
94kWh
AC Charging
11kW
DC Charging
480kW
10–80% Time
16min

The Zeekr 7GT Performance AWD charges at up to 480 kW on a DC fast charger and 11 kW on AC. It takes about 16 minutes to charge from 10 to 80% and 14.2 hours to charge from empty on a 7 kW home charger. It has a 94 kWh NMC battery.

Zeekr 7GT Performance AWD Key Battery and Charging Specs

Zeekr 7GT Performance AWD battery and charging specs
Usable Battery94 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationLeft Side (Rear)
0 to 100% at Home (7 kW)14.2 hrs
Efficiency168 Wh/km

The Zeekr 7GT Performance AWD uses a 94 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Zeekr's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

Zeekr 7GT Performance AWD Charging Times

Zeekr 7GT Performance AWD Max Charging Speed

Zeekr 7GT Performance AWD maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)480 kW

How Long Does a Zeekr 7GT Performance AWD Take to Charge?

Power point, wall charger and DC fast charger for the Zeekr 7GT Performance AWD
Zeekr 7GT Performance AWD charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW43.2 hrs (0 to 100%)14 km per hour
15A power point (3.6 kW)3.6 kW27.6 hrs (0 to 100%)21 km per hour
7 kW home wall charger7 kW14.2 hrs (0 to 100%)42 km per hour
11 kW three-phase charger11 kW9.0 hrs (0 to 100%)65 km per hour
50 kW DC fast charger47.5 kW83 min (10 to 80%)71 km in 15 min
150 kW DC fast charger142.5 kW28 min (10 to 80%)212 km in 15 min
350 kW DC ultra-fast charger247 kW16 min (10 to 80%)368 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the Zeekr 7GT Performance AWD

A 7 kW single-phase wall charger suits the Zeekr 7GT Performance AWD. It charges the battery from empty to full in 14.2 hrs and adds about 42 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Zeekr 7GT Performance AWD's full AC speed and charges it in 9.0 hrs.

Find the Right Charger for Your Zeekr 7GT Performance AWD

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the Zeekr 7GT Performance AWD
Detail7 kW Single Phase11 kW Three Phase
0 to 100%14.2 hrs9.0 hrs
Range per hour42 km65 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the Zeekr 7GT Performance AWD Come With a Charger?

New EVs like the Zeekr 7GT Performance AWD normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 43.2 hrs to fully charge the battery. A 7 kW wall charger does it in 14.2 hrs.

How Much Does It Cost to Charge a Zeekr 7GT Performance AWD?

A full charge costs $6.58 at home on an EV plan at $0.07/kWh, and $32.90 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $65.80. A petrol medium car uses about 7.8 L/100 km, which at $2.00 a litre costs $15.60 per 100 km.

Cost to charge the Zeekr 7GT Performance AWD compared with a petrol medium car
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol medium carNot applicable$15.60$2,340Not applicable
Home, flat rate $0.35/kWh$32.90$5.88$882$1,458
Home, EV plan $0.07/kWh$6.58$1.18$176$2,164
Public DC $0.70/kWh$65.80$11.76$1,764$576

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $706 a year on charging the Zeekr 7GT Performance AWD at home.

Zeekr 7GT Performance AWD Fast Charging Rank and Road Trip Charging

The Zeekr 7GT Performance AWD charges at up to 480 kW on a DC charger.

Zeekr 7GT Performance AWD 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 469 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 16 minutes, for a total trip time of about 5 hr 16 min. A 1,000 km trip needs 2 fast charging stops of about 16 minutes each, 32 min in total, for a total trip time of about 10 hr 32 min.

Estimated road trip charging for the Zeekr 7GT Performance AWD
TripCharging stopsCharging timeTotal trip time
500 km116 min5 hr 16 min
1,000 km232 min10 hr 32 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

Zeekr 7GT Performance AWD Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
Zeekr 7GT Performance AWD bidirectional charging support
FeatureSupportedMax Output
V2LYes3.3 kW
V2HNo
V2GNo

The Zeekr 7GT Performance AWD supports V2L and can power appliances up to 3.3 kW. It does not support V2H or V2G.

Zeekr 7GT Performance AWD Charging FAQ

Track the Zeekr 7GT

Get 7GT price drops, offers and news by email.