Volvo EX90 Ultra Twin Motor Performance

Volvo EX90 Ultra Twin Motor Performance Charging Speed, Time and Cost

Large SUV · 2025 – Current

Usable Battery
107kWh
AC Charging
11kW
DC Charging
250kW
10–80% Time
30min

The Volvo EX90 Ultra Twin Motor Performance charges at up to 250 kW on a DC fast charger and 11 kW on AC. It takes about 30 minutes to charge from 10 to 80% and 16.2 hours to charge from empty on a 7 kW home charger. It has a 107 kWh NMC battery.

Volvo EX90 Ultra Twin Motor Performance Key Battery and Charging Specs

Volvo EX90 Ultra Twin Motor Performance battery and charging specs
Usable Battery107 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationLeft Side (Rear)
0 to 100% at Home (7 kW)16.2 hrs
Efficiency178 Wh/km

The Volvo EX90 Ultra Twin Motor Performance uses a 107 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Volvo's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

Volvo EX90 Ultra Twin Motor Performance Charging Times

Volvo EX90 Ultra Twin Motor Performance Max Charging Speed

Volvo EX90 Ultra Twin Motor Performance maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)250 kW

How Long Does a Volvo EX90 Ultra Twin Motor Performance Take to Charge?

Power point, wall charger and DC fast charger for the Volvo EX90 Ultra Twin Motor Performance
Volvo EX90 Ultra Twin Motor Performance charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW49.2 hrs (0 to 100%)13 km per hour
15A power point (3.6 kW)3.6 kW31.5 hrs (0 to 100%)20 km per hour
7 kW home wall charger7 kW16.2 hrs (0 to 100%)39 km per hour
11 kW three-phase charger11 kW10.3 hrs (0 to 100%)62 km per hour
50 kW DC fast charger47.5 kW95 min (10 to 80%)67 km in 15 min
150 kW DC fast charger142.5 kW32 min (10 to 80%)200 km in 15 min
350 kW DC ultra-fast charger149.8 kW30 min (10 to 80%)210 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the Volvo EX90 Ultra Twin Motor Performance

A 7 kW single-phase wall charger suits the Volvo EX90 Ultra Twin Motor Performance. It charges the battery from empty to full in 16.2 hrs and adds about 39 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Volvo EX90 Ultra Twin Motor Performance's full AC speed and charges it in 10.3 hrs.

Find the Right Charger for Your Volvo EX90 Ultra Twin Motor Performance

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the Volvo EX90 Ultra Twin Motor Performance
Detail7 kW Single Phase11 kW Three Phase
0 to 100%16.2 hrs10.3 hrs
Range per hour39 km62 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the Volvo EX90 Ultra Twin Motor Performance Come With a Charger?

New EVs like the Volvo EX90 Ultra Twin Motor Performance normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 49.2 hrs to fully charge the battery. A 7 kW wall charger does it in 16.2 hrs.

How Much Does It Cost to Charge a Volvo EX90 Ultra Twin Motor Performance?

A full charge costs $7.49 at home on an EV plan at $0.07/kWh, and $37.45 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $74.90. A petrol large SUV uses about 11.5 L/100 km, which at $2.00 a litre costs $23.00 per 100 km.

Cost to charge the Volvo EX90 Ultra Twin Motor Performance compared with a petrol large SUV
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol large SUVNot applicable$23.00$3,450Not applicable
Home, flat rate $0.35/kWh$37.45$6.23$935$2,515
Home, EV plan $0.07/kWh$7.49$1.25$187$3,263
Public DC $0.70/kWh$74.90$12.46$1,869$1,581

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $748 a year on charging the Volvo EX90 Ultra Twin Motor Performance at home.

Volvo EX90 Ultra Twin Motor Performance Fast Charging Rank and Road Trip Charging

The Volvo EX90 Ultra Twin Motor Performance ranks 1 of 4 large SUV EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for large SUV EVs priced near the Volvo EX90 Ultra Twin Motor Performance
RankVehiclePricePeak DC (kW)10–80% time
1Volvo EX90 Plus Twin Motor$124,99025030 min
1Volvo EX90 Ultra Twin Motor Performance$134,99025030 min
3Audi Q8 e-tron 50 e-quattro$140,09015031 min
4Lexus RZ 450e$135,00014750 min

Volvo EX90 Ultra Twin Motor Performance 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 468 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 30 minutes, for a total trip time of about 5 hr 30 min. A 1,000 km trip needs 2 fast charging stops of about 30 minutes each, 1 hr in total, for a total trip time of about 11 hr.

Estimated road trip charging for the Volvo EX90 Ultra Twin Motor Performance
TripCharging stopsCharging timeTotal trip time
500 km130 min5 hr 30 min
1,000 km21 hr11 hr

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

Volvo EX90 Ultra Twin Motor Performance Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
Volvo EX90 Ultra Twin Motor Performance bidirectional charging support
FeatureSupportedMax Output
V2LNo
V2HNo
V2GNo

The Volvo EX90 Ultra Twin Motor Performance does not support bidirectional charging.

Volvo EX90 Ultra Twin Motor Performance Deals and Finance

Pricing starts from $134,990. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

Volvo EX90 Ultra Twin Motor Performance Charging FAQ

Track the Volvo EX90

Get EX90 price drops, offers and news by email.