Polestar 3 Long Range Dual Motor with Performance pack

Polestar 3 Long Range Dual Motor with Performance pack Charging Speed, Time and Cost

Medium SUV · 2023 – Current

Usable Battery
107kWh
AC Charging
11kW
DC Charging
250kW
10–80% Time
32min

The Polestar 3 Long Range Dual Motor with Performance pack charges at up to 250 kW on a DC fast charger and 11 kW on AC. It takes about 32 minutes to charge from 10 to 80% and 16.2 hours to charge from empty on a 7 kW home charger. It has a 107 kWh NMC battery.

Polestar 3 Long Range Dual Motor with Performance pack Key Battery and Charging Specs

Polestar 3 Long Range Dual Motor with Performance pack battery and charging specs
Usable Battery107 kWh
Battery ChemistryNMC
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationLeft Side (Rear)
0 to 100% at Home (7 kW)16.2 hrs
Efficiency191 Wh/km

The Polestar 3 Long Range Dual Motor with Performance pack uses a 107 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Polestar's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

Polestar 3 Long Range Dual Motor with Performance pack Charging Times

Polestar 3 Long Range Dual Motor with Performance pack Max Charging Speed

Polestar 3 Long Range Dual Motor with Performance pack maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)250 kW

How Long Does a Polestar 3 Long Range Dual Motor with Performance pack Take to Charge?

Power point, wall charger and DC fast charger for the Polestar 3 Long Range Dual Motor with Performance pack
Polestar 3 Long Range Dual Motor with Performance pack charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW49.2 hrs (0 to 100%)12 km per hour
15A power point (3.6 kW)3.6 kW31.5 hrs (0 to 100%)19 km per hour
7 kW home wall charger7 kW16.2 hrs (0 to 100%)37 km per hour
11 kW three-phase charger11 kW10.3 hrs (0 to 100%)58 km per hour
50 kW DC fast charger47.5 kW95 min (10 to 80%)62 km in 15 min
150 kW DC fast charger140.4 kW32 min (10 to 80%)184 km in 15 min
350 kW DC ultra-fast charger140.4 kW32 min (10 to 80%)184 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the Polestar 3 Long Range Dual Motor with Performance pack

A 7 kW single-phase wall charger suits the Polestar 3 Long Range Dual Motor with Performance pack. It charges the battery from empty to full in 16.2 hrs and adds about 37 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Polestar 3 Long Range Dual Motor with Performance pack's full AC speed and charges it in 10.3 hrs.

Find the Right Charger for Your Polestar 3 Long Range Dual Motor with Performance pack

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the Polestar 3 Long Range Dual Motor with Performance pack
Detail7 kW Single Phase11 kW Three Phase
0 to 100%16.2 hrs10.3 hrs
Range per hour37 km58 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the Polestar 3 Long Range Dual Motor with Performance pack Come With a Charger?

New EVs like the Polestar 3 Long Range Dual Motor with Performance pack normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 49.2 hrs to fully charge the battery. A 7 kW wall charger does it in 16.2 hrs.

How Much Does It Cost to Charge a Polestar 3 Long Range Dual Motor with Performance pack?

A full charge costs $7.49 at home on an EV plan at $0.07/kWh, and $37.45 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $74.90. A petrol medium SUV uses about 10.2 L/100 km, which at $2.00 a litre costs $20.40 per 100 km.

Cost to charge the Polestar 3 Long Range Dual Motor with Performance pack compared with a petrol medium SUV
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol medium SUVNot applicable$20.40$3,060Not applicable
Home, flat rate $0.35/kWh$37.45$6.69$1,003$2,057
Home, EV plan $0.07/kWh$7.49$1.34$201$2,859
Public DC $0.70/kWh$74.90$13.37$2,006$1,054

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $802 a year on charging the Polestar 3 Long Range Dual Motor with Performance pack at home.

Polestar 3 Long Range Dual Motor with Performance pack Fast Charging Rank and Road Trip Charging

The Polestar 3 Long Range Dual Motor with Performance pack ranks 4 of 5 medium SUV EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for medium SUV EVs priced near the Polestar 3 Long Range Dual Motor with Performance pack
RankVehiclePricePeak DC (kW)10–80% time
1Porsche Macan 4$134,40027021 min
1Audi SQ6 e-tron e-quattro$137,50027023 min
1Porsche Macan 4S$149,30027021 min
4Polestar 3 Long Range Dual Motor$132,90025032 min
4Polestar 3 Long Range Dual Motor with Performance pack$142,75425032 min

Polestar 3 Long Range Dual Motor with Performance pack 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 437 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 32 minutes, for a total trip time of about 5 hr 32 min. A 1,000 km trip needs 2 fast charging stops of about 32 minutes each, 1 hr 4 min in total, for a total trip time of about 11 hr 4 min.

Estimated road trip charging for the Polestar 3 Long Range Dual Motor with Performance pack
TripCharging stopsCharging timeTotal trip time
500 km132 min5 hr 32 min
1,000 km21 hr 4 min11 hr 4 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

Polestar 3 Long Range Dual Motor with Performance pack Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
Polestar 3 Long Range Dual Motor with Performance pack bidirectional charging support
FeatureSupportedMax Output
V2LNo
V2HNo
V2GNo

The Polestar 3 Long Range Dual Motor with Performance pack does not support bidirectional charging.

Polestar 3 Long Range Dual Motor with Performance pack Deals and Finance

Pricing starts from $142,754. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

Polestar 3 Long Range Dual Motor with Performance pack Charging FAQ

Track the Polestar 3

Get 3 price drops, offers and news by email.