
Medium SUV · 2026 – CurrentFBT exempt
$58,000RRP before on-road costs
The KGM Torres EVX is a front-drive medium SUV priced from $58,000 RRP, with a 73.4kWh LFP battery and 503km of WLTP range (an estimated 472km in mixed real-world driving).
See what this Torres EVX costs per week on a novated leaseFBT exempt
| Battery capacity (total) | 73.4 kWh |
|---|---|
| Battery capacity (usable) | 71 kWh |
| Battery chemistry | LFP |
| Charge port (AC / DC) | Type 2 / CCS |
| Charge port location | Left Side - Front |
| AC charging (max) | 11 kW |
|---|---|
| AC charge time (0–100%) | 7 hrs 12 mins |
| DC fast charging (max) | 130 kW |
| DC fast charging (avg) | 81 kW |
| DC charge time (10–80%) | 37 minutes |
See the real charging speed each home charger gets with this car. 3 quick questions.
A full charge costs different amounts depending on your electricity plan and time-of-use rates. Enter your own rate in the EV charging cost calculator to see what the KGM Torres EVX costs you.
| Vehicle-to-Load (V2L) | Yes |
|---|---|
| Max power output (V2L) | 3.3 kW |
| Vehicle-to-Home (V2H) | No |
|---|---|
| Vehicle-to-Grid (V2G) | No |
| Test | Range | Consumption |
|---|---|---|
| WLTP (combined) | 503 km | 141 Wh/km |
| Real-world (Combined)* | 472 km | 150 Wh/km |
| Real-world (City)* | 517 km | 137 Wh/km |
| Real-world (Highway)* | 392 km | 181 Wh/km |
*Estimated
| 0–100 km/h | 8.1 s |
|---|---|
| Top speed | 170 km/h |
| Power (max) | 152 kW |
| Torque (max) | 340 Nm |
|---|---|
| Drive | Front-wheel drive (FWD) |
| Powertrain | BEV |
| Seats | 5 |
|---|---|
| Length × width × height | 4,715 × 1,890 × 1,725 mm |
| Wheelbase | 2,680 mm |
| Body type | SUV |
| Turning circle | 10.8 m |
| Boot space (seats up / folded) | 465 L / 703 L |
|---|---|
| Towing (braked / unbraked) | 1,500 kg / 500 kg |
| Dedicated EV platform | No |
| Segment | Medium SUV |
| Vehicle warranty | 7 years / unlimited km |
|---|---|
| Battery warranty | 10 years / unlimited km |
| Service interval | 12 months / 20,000 km |
$58,000 RRP before on-road costs.
An estimated 472km in mixed real-world driving, against 503km on the WLTP test.
About 7 hrs 12 mins from empty on an 11kW home wallbox, or about 37 minutes from 10-80% on a DC fast charger.
About $23 for a full charge at home at 33c/kWh (71kWh battery, estimated). Charging cost calculator
Yes. At $58,000 it is under the $91,387 LCT threshold for fuel-efficient cars, so it qualifies for the FBT exemption on a novated lease. See your weekly cost
Subscribe to get the latest EV news and deals!
Price drops, new variants and offers on the Torres EVX you're looking at.
$58,000
RRP before on-road costs