Deepal S07
Deepal S07
Deepal S07
Deepal S07
Deepal S07
Deepal S07

Deepal S07 specs and price

Available 2024 - CurrentFBT exempt

The Deepal S07 is a rear-drive medium SUV priced from $53,900 RRP, with a 66.8kWh NMC battery and 410km of WLTP range (an estimated 385km in mixed real-world driving).

Price$53,900RRP before on-road costs

410 km
Range (WLTP)
66.8 kWh
Battery
92 kW
DC Fast Charge
7.9 s
0–100 km/h
ANCAPNot yet rated

Looking for a deal on this car? See the latest EV offers and deals

Key Specs

  • Price: The Deepal S07 costs $53,900 RRP before on-road costs in Australia.
  • Range: 410km WLTP, or an estimated 385km in mixed real-world driving.
  • Battery: 66.8kWh NMC (66.8kWh usable).
  • Charging: Up to 92kW DC (10-80% in 49 minutes) and 11kW AC (0-100% in 6 hrs 42 mins).
  • 0-100 km/h: 7.9 seconds.
  • Ground clearance: 145mm.
  • Towing: 1,500kg braked, 750kg unbraked.
  • Weight: 2,073kg kerb weight.
  • Boot space: 445L, or 1,385L with the seats folded; 125L frunk.
  • V2L / V2H / V2G: Supports V2L at 3.3kW; V2H no; V2G no.

Deepal S07 on a novated lease: see your weekly costFBT exempt

About the S07

The Deepal S07 is a sleek and sporty mid-size electric SUV that emphasizes modern technology and a driver-focused design. It features a minimalist, high-tech interior and an aerodynamic exterior, appealing to a younger, tech-savvy audience looking for style and performance.

Battery and Charging

How EV charging works
Deepal S07 battery and charging specifications
Battery size (capacity)66.8 kWh
Battery size (useable)66.8 kWh
Battery chemistryNMC
Charge port type (AC / DC)Type 2 / CCS
Charge port locationLeft Side - Rear
Charge power (max) – AC11 kW
Charge time (0-100%) – AC6 hrs 42 mins
Fast charge power (max) – DC92 kW
Fast charge power (avg) – DC57 kW
Fast charge time (10-80%) – DC49 minutes

Cost to fully charge at home: about $22 (66.8kWh at 33c/kWh, estimated)

Find the right charger for your car →

Find the right charger for your Deepal S07

See the real charging speed each home charger gets with this car. 3 quick questions.

Charge a 66.8kWh battery at home in 6 hrs 42 mins.

Bidirectional Charging (V2X)

Bidirectional charging support
Vehicle-to-Grid (V2G)No
Vehicle-to-Home (V2H)No
Vehicle-to-Load (V2L)Yes
Max Power Output (V2L)3.3 kW

Range and Efficiency

WLTP is the standard range test used in Australia and Europe. Real-world figures are Zecar estimates, calculated from the WLTP result and body shape at an assumed average speed of 70 km/h (combined), 30 km/h (city) and 110 km/h (highway). Your range will vary with weather, load and driving style. Read our EV range guide
TestRangeConsumption
WLTP (Combined)410 km163 Wh/km
Real-world (Combined)*385 km174 Wh/km
Real-world (City)*421 km159 Wh/km
Real-world (Highway)*320 km209 Wh/km

Running cost: about $5.74 per 100km charging at home (estimated combined consumption at 33c/kWh)

*Estimated

A full charge costs about $22 on a standard tariff. Compare EV plans to cut it.

Performance

7.9 s

Acceleration (0-100 km/hr)

180 km/h

Top speed

160 kW

Power

320 Nm

Torque

Rear

Drive type

BEV

Fuel

Body and Chassis

Body and chassis specifications
Seats5
Dimensions (LxWxH)4750mm x 1930mm x 1625mm
Wheelbase2,900 mm
Ground Clearance145 mm
Kerb Weight2,073 kg
Body StyleSUV
Turning Circle11.5 m
Boot Capacity (std/max)445 L / 1,385 L
Frunk Capacity125 L
Towing capacity (unbraked/braked)750 kg / 1,500 kg
EV Dedicated PlatformYes
PlatformChangan EPA1
SegmentMedium SUV

Warranty and Servicing

Car warranty

7 years / 160,000 km

Battery warranty

8 years / 240,000 km

Regular service intervals

12 months / 20,000 km

Deepal S07 - Latest News, Reviews and Guides

Frequently Asked Questions

Subscribe to get the latest EV news and deals!

Price drops, new variants and offers on the S07 you're looking at.