
Large SUV · 2025 – Current
The Mercedes-Benz G-Class G580 charges at up to 200 kW on a DC fast charger and 11 kW on AC. It takes about 32 minutes to charge from 10 to 80% and 17.5 hours to charge from empty on a 7 kW home charger. It has a 116 kWh NMC battery.
| Usable Battery | 116 kWh |
|---|---|
| Battery Chemistry | NMC |
| Charge Port | Type 2 (AC), CCS2 (DC) |
| Charge Port Location | Left Side (Front) |
| 0 to 100% at Home (7 kW) | 17.5 hrs |
| Efficiency | 245 Wh/km |
The Mercedes-Benz G-Class G580 uses a 116 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Mercedes-Benz's advice.
Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.
| Type | Max Speed |
|---|---|
| AC charging speed | 11 kW |
| DC charging speed (peak) | 200 kW |

| Charger | Power Used | Time | Range Added |
|---|---|---|---|
| 10A power point (2.3 kW) | 2.3 kW | 53.4 hrs (0 to 100%) | 9 km per hour |
| 15A power point (3.6 kW) | 3.6 kW | 34.1 hrs (0 to 100%) | 15 km per hour |
| 7 kW home wall charger | 7 kW | 17.5 hrs (0 to 100%) | 29 km per hour |
| 11 kW three-phase charger | 11 kW | 11.2 hrs (0 to 100%) | 45 km per hour |
| 50 kW DC fast charger | 47.5 kW | 103 min (10 to 80%) | 48 km in 15 min |
| 150 kW DC fast charger | 142.5 kW | 34 min (10 to 80%) | 145 km in 15 min |
| 350 kW DC ultra-fast charger | 152.3 kW | 32 min (10 to 80%) | 155 km in 15 min |
Icons: grey = power point, green outline = home charger, dark = public DC fast charger.
A 7 kW single-phase wall charger suits the Mercedes-Benz G-Class G580. It charges the battery from empty to full in 17.5 hrs and adds about 29 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Mercedes-Benz G-Class G580's full AC speed and charges it in 11.2 hrs.
See the real charging speed each home charger gets with this car. 3 quick questions.
| Detail | 7 kW Single Phase | 11 kW Three Phase |
|---|---|---|
| 0 to 100% | 17.5 hrs | 11.2 hrs |
| Range per hour | 29 km | 45 km |
| Needs three-phase power | No | Yes |
| Typical installed cost | $1,200 to $2,800 | $1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting |
Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.
New EVs like the Mercedes-Benz G-Class G580 normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 53.4 hrs to fully charge the battery. A 7 kW wall charger does it in 17.5 hrs.
A full charge costs $8.12 at home on an EV plan at $0.07/kWh, and $40.60 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $81.20. A petrol large SUV uses about 11.5 L/100 km, which at $2.00 a litre costs $23.00 per 100 km.
| Where You Charge | Full Charge | Per 100 km | Per Year | Saving vs Petrol |
|---|---|---|---|---|
| Petrol large SUV | Not applicable | $23.00 | $3,450 | Not applicable |
| Home, flat rate $0.35/kWh | $40.60 | $8.58 | $1,286 | $2,164 |
| Home, EV plan $0.07/kWh | $8.12 | $1.72 | $257 | $3,193 |
| Public DC $0.70/kWh | $81.20 | $17.15 | $2,573 | $877 |
Icons: grey = petrol, green outline = home charging, dark = public charging.
Per year is based on 15,000 km a year.
Switching from a flat tariff to an EV plan saves about $1,029 a year on charging the Mercedes-Benz G-Class G580 at home.
The Mercedes-Benz G-Class G580 charges at up to 200 kW on a DC charger.
Using Zecar's estimated highway range of 369 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 32 minutes, for a total trip time of about 5 hr 32 min. A 1,000 km trip needs 3 fast charging stops of about 32 minutes each, 1 hr 36 min in total, for a total trip time of about 11 hr 36 min.
| Trip | Charging stops | Charging time | Total trip time |
|---|---|---|---|
| 500 km | 1 | 32 min | 5 hr 32 min |
| 1,000 km | 3 | 1 hr 36 min | 11 hr 36 min |
Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.
Plan your trip costs with the EV charging calculator →| Feature | Supported | Max Output |
|---|---|---|
| V2L | No | |
| V2H | No | |
| V2G | No |
The Mercedes-Benz G-Class G580 does not support bidirectional charging.
Pricing starts from $249,900. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works
Get a Novated Lease Quote17.5 hrs for 0 to 100% on a 7 kW home charger, and 32 minutes for 10 to 80% at a DC charger of 200 kW or more.
11 kW on AC and 200 kW on DC, adding about 155 km of range in 15 minutes on a fast charger.
Type 2 for AC and CCS2 for DC, on the left side (front).
$8.12 at home on an EV plan, $40.60 on a flat tariff, or $81.20 at a public DC charger (compare EV energy plans).
Yes, at Superchargers open to non-Tesla EVs, using its CCS2 plug, so check the Tesla app for which sites are open.
No, the Mercedes-Benz G-Class G580 does not support V2L.
Track the Mercedes-Benz G-Class
Get G-Class price drops, offers and news by email.