The Mercedes-Benz EQE 300 SUV charges at up to 200 kW on a DC fast charger and 11 kW on AC. It takes about 32 minutes to charge from 10 to 80% and 13.7 hours to charge from empty on a 7 kW home charger. It has a 90.6 kWh NMC battery.
| Usable Battery | 90.6 kWh |
|---|---|
| Battery Chemistry | NMC |
| Charge Port | Type 2 (AC), CCS2 (DC) |
| Charge Port Location | Right Side (Rear) |
| 0 to 100% at Home (7 kW) | 13.7 hrs |
| Efficiency | 177 Wh/km |
The Mercedes-Benz EQE 300 SUV uses a 90.6 kWh NMC battery. For daily driving, charge to 80 to 90% and save 100% for long trips (LFP vs NMC vs NCA batteries explained). Check your owner's manual for Mercedes-Benz's advice.
Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.
| Type | Max Speed |
|---|---|
| AC charging speed | 11 kW |
| DC charging speed (peak) | 200 kW |

| Charger | Power Used | Time | Range Added |
|---|---|---|---|
| 10A power point (2.3 kW) | 2.3 kW | 41.7 hrs (0 to 100%) | 13 km per hour |
| 15A power point (3.6 kW) | 3.6 kW | 26.6 hrs (0 to 100%) | 20 km per hour |
| 7 kW home wall charger | 7 kW | 13.7 hrs (0 to 100%) | 40 km per hour |
| 11 kW three-phase charger | 11 kW | 8.7 hrs (0 to 100%) | 62 km per hour |
| 50 kW DC fast charger | 47.5 kW | 80 min (10 to 80%) | 67 km in 15 min |
| 150 kW DC fast charger | 118.9 kW | 32 min (10 to 80%) | 168 km in 15 min |
| 350 kW DC ultra-fast charger | 118.9 kW | 32 min (10 to 80%) | 168 km in 15 min |
Icons: grey = power point, green outline = home charger, dark = public DC fast charger.
A 7 kW single-phase wall charger suits the Mercedes-Benz EQE 300 SUV. It charges the battery from empty to full in 13.7 hrs and adds about 40 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the Mercedes-Benz EQE 300 SUV's full AC speed and charges it in 8.7 hrs.
See the real charging speed each home charger gets with this car. 3 quick questions.
| Detail | 7 kW Single Phase | 11 kW Three Phase |
|---|---|---|
| 0 to 100% | 13.7 hrs | 8.7 hrs |
| Range per hour | 40 km | 62 km |
| Needs three-phase power | No | Yes |
| Typical installed cost | $1,200 to $2,800 | $1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting |
Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.
New EVs like the Mercedes-Benz EQE 300 SUV normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 41.7 hrs to fully charge the battery. A 7 kW wall charger does it in 13.7 hrs.
A full charge costs $6.34 at home on an EV plan at $0.07/kWh, and $31.71 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $63.42.
| Where You Charge | Full Charge | Per 100 km | Per Year |
|---|---|---|---|
| Home, flat rate $0.35/kWh | $31.71 | $6.20 | $929 |
| Home, EV plan $0.07/kWh | $6.34 | $1.24 | $186 |
| Public DC $0.70/kWh | $63.42 | $12.39 | $1,859 |
Icons: grey = petrol, green outline = home charging, dark = public charging.
Per year is based on 15,000 km a year.
Switching from a flat tariff to an EV plan saves about $743 a year on charging the Mercedes-Benz EQE 300 SUV at home.
The Mercedes-Benz EQE 300 SUV ranks 3 of 4 medium SUV EVs priced within $10,000 of it for DC fast charging power.
| Rank | Vehicle | Price | Peak DC (kW) | 10–80% time |
|---|---|---|---|---|
| 1 | BMW iX4 50 xDrive | $119,900 | 400 | 21 min |
| 2 | Genesis GV60 Magma | $130,000 | 233 | 18 min |
| 3 | Mercedes-Benz EQE 300 SUV | $126,000 | 200 | 32 min |
| 4 | BMW iX xDrive 45 | $131,900 | 175 | 30 min |
Using Zecar's estimated highway range of 458 km and an average of 100 km/h: A 500 km trip needs 1 fast charging stop of about 32 minutes, for a total trip time of about 5 hr 32 min. A 1,000 km trip needs 2 fast charging stops of about 32 minutes each, 1 hr 4 min in total, for a total trip time of about 11 hr 4 min.
| Trip | Charging stops | Charging time | Total trip time |
|---|---|---|---|
| 500 km | 1 | 32 min | 5 hr 32 min |
| 1,000 km | 2 | 1 hr 4 min | 11 hr 4 min |
Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 150 kW-capable charger. Real times vary with weather, speed, load and charger.
Plan your trip costs with the EV charging calculator →| Feature | Supported | Max Output |
|---|---|---|
| V2L | No | |
| V2H | No | |
| V2G | No |
The Mercedes-Benz EQE 300 SUV does not support bidirectional charging.
Pricing starts from $126,000. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works
Get a Novated Lease Quote13.7 hrs for 0 to 100% on a 7 kW home charger, and 32 minutes for 10 to 80% at a DC charger of 200 kW or more.
11 kW on AC and 200 kW on DC, adding about 168 km of range in 15 minutes on a fast charger.
Type 2 for AC and CCS2 for DC, on the right side (rear).
$6.34 at home on an EV plan, $31.71 on a flat tariff, or $63.42 at a public DC charger (compare EV energy plans).
Yes, at Superchargers open to non-Tesla EVs, using its CCS2 plug, so check the Tesla app for which sites are open.
No, the Mercedes-Benz EQE 300 SUV does not support V2L.
Track the Mercedes-Benz EQE