LDV eDeliver 7 SWB

LDV eDeliver 7 SWB Charging Speed, Time and Cost

Van · 2023 – CurrentFBT exempt

Usable Battery
72.4kWh
AC Charging
11kW
DC Charging
78kW
10–80% Time
50min

The LDV eDeliver 7 SWB charges at up to 78 kW on a DC fast charger and 11 kW on AC. It takes about 50 minutes to charge from 10 to 80% and 10.9 hours to charge from empty on a 7 kW home charger. It has a 72.4 kWh LFP battery.

LDV eDeliver 7 SWB Key Battery and Charging Specs

LDV eDeliver 7 SWB battery and charging specs
Usable Battery72.4 kWh
Battery ChemistryLFP
Charge PortType 2 (AC), CCS2 (DC)
Charge Port LocationLeft Side (Rear)
0 to 100% at Home (7 kW)10.9 hrs
Efficiency228 Wh/km

The LDV eDeliver 7 SWB uses a 72.4 kWh LFP battery. LFP batteries handle regular charging to 100% with less wear than other chemistries (LFP vs NMC vs NCA batteries explained). Check your owner's manual for LDV's advice.

Compare the best home EV charger in Australia and work out how much electric car charging costs for your driving.

LDV eDeliver 7 SWB Charging Times

LDV eDeliver 7 SWB Max Charging Speed

LDV eDeliver 7 SWB maximum charging speed
TypeMax Speed
AC charging speed11 kW
DC charging speed (peak)78 kW

How Long Does a LDV eDeliver 7 SWB Take to Charge?

Power point, wall charger and DC fast charger for the LDV eDeliver 7 SWB
LDV eDeliver 7 SWB charging times by charger
ChargerPower UsedTimeRange Added
10A power point (2.3 kW)2.3 kW33.3 hrs (0 to 100%)10 km per hour
15A power point (3.6 kW)3.6 kW21.3 hrs (0 to 100%)16 km per hour
7 kW home wall charger7 kW10.9 hrs (0 to 100%)31 km per hour
11 kW three-phase charger11 kW7.0 hrs (0 to 100%)48 km per hour
50 kW DC fast charger47.5 kW64 min (10 to 80%)52 km in 15 min
150 kW DC fast charger61 kW50 min (10 to 80%)67 km in 15 min

Icons: grey = power point, green outline = home charger, dark = public DC fast charger.

Best Home Charger for the LDV eDeliver 7 SWB

A 7 kW single-phase wall charger suits the LDV eDeliver 7 SWB. It charges the battery from empty to full in 10.9 hrs and adds about 31 km of range every hour. If your home already has three-phase power, an 11 kW charger uses the LDV eDeliver 7 SWB's full AC speed and charges it in 7.0 hrs.

Find the Right Charger for Your LDV eDeliver 7 SWB

See the real charging speed each home charger gets with this car. 3 quick questions.

Home chargers for the LDV eDeliver 7 SWB
Detail7 kW Single Phase11 kW Three Phase
0 to 100%10.9 hrs7.0 hrs
Range per hour31 km48 km
Needs three-phase powerNoYes
Typical installed cost$1,200 to $2,800$1,800 to $3,500 with existing three-phase power. $4,000 to $12,000+ if your home needs converting

Installed costs are indicative for Australia and include the charger and standard installation. A switchboard upgrade, if needed, can add $900 to $3,500.

Does the LDV eDeliver 7 SWB Come With a Charger?

New EVs like the LDV eDeliver 7 SWB normally come with a complimentary portable charger that plugs into a standard 10A power point. It's handy for top-ups but takes about 33.3 hrs to fully charge the battery. A 7 kW wall charger does it in 10.9 hrs.

How Much Does It Cost to Charge a LDV eDeliver 7 SWB?

A full charge costs $5.07 at home on an EV plan at $0.07/kWh, and $25.34 on a typical flat tariff of $0.35/kWh. At a public DC charger at up to $0.70/kWh it costs $50.68. A petrol mid-size van uses about 7.6 L/100 km, which at $2.00 a litre costs $15.20 per 100 km.

Cost to charge the LDV eDeliver 7 SWB compared with a petrol mid-size van
Where You ChargeFull ChargePer 100 kmPer YearSaving vs Petrol
Petrol mid-size vanNot applicable$15.20$2,280Not applicable
Home, flat rate $0.35/kWh$25.34$7.98$1,197$1,083
Home, EV plan $0.07/kWh$5.07$1.60$239$2,041
Public DC $0.70/kWh$50.68$15.96$2,394$-114

Icons: grey = petrol, green outline = home charging, dark = public charging.

Per year is based on 15,000 km a year.

Switching from a flat tariff to an EV plan saves about $958 a year on charging the LDV eDeliver 7 SWB at home.

LDV eDeliver 7 SWB Fast Charging Rank and Road Trip Charging

The LDV eDeliver 7 SWB ranks 6 of 7 van EVs priced within $10,000 of it for DC fast charging power.

DC fast charging rank for van EVs priced near the LDV eDeliver 7 SWB
RankVehiclePricePeak DC (kW)10–80% time
1Hyundai Staria Load Electric$70,99035020 min
2Peugeot e-PARTNER Test$59,99010026 min
2Peugeot e-PARTNER$59,99010026 min
4LDV eDeliver 7 LWB$69,4639050 min
5Renault Kangoo E-Tech L2$63,9908037 min
6LDV eDeliver 7 SWB$67,3587850 min

LDV eDeliver 7 SWB 500 km and 1,000 km Road Trips

Using Zecar's estimated highway range of 232 km and an average of 100 km/h: A 500 km trip needs 2 fast charging stops of about 50 minutes each, 1 hr 40 min in total, for a total trip time of about 6 hr 40 min. A 1,000 km trip needs 5 fast charging stops of about 50 minutes each, 4 hr 10 min in total, for a total trip time of about 14 hr 10 min.

Estimated road trip charging for the LDV eDeliver 7 SWB
TripCharging stopsCharging timeTotal trip time
500 km21 hr 40 min6 hr 40 min
1,000 km54 hr 10 min14 hr 10 min

Total trip time is driving at an average of 100 km/h plus charging time. Estimates assume a start at 100%, arrival at no less than 10% and charging from 10% to 80% at a 78 kW-capable charger. Real times vary with weather, speed, load and charger.

Plan your trip costs with the EV charging calculator →

LDV eDeliver 7 SWB Bidirectional Charging (V2X): V2L, V2H and V2G

  • V2L powers appliances from the car's socket.
  • V2H powers your home during an outage or peak pricing.
  • V2G sends energy back to the grid.
LDV eDeliver 7 SWB bidirectional charging support
FeatureSupportedMax Output
V2LNo
V2HNo
V2GNo

The LDV eDeliver 7 SWB does not support bidirectional charging.

LDV eDeliver 7 SWB Deals and Finance

Pricing starts from $67,358. A novated lease lets you pay for the car and its running costs from your pre-tax salary, and eligible EVs are exempt from fringe benefits tax. How the EV FBT exemption works

Get a Novated Lease Quote

LDV eDeliver 7 SWB Charging FAQ

Track the LDV eDeliver 7

Get eDeliver 7 price drops, offers and news by email.